Detailed Inspection of Thrust Reverser Forward Frame to 3/9 O'clock Beam Joint [CFMB]
TASK 78-32-00-210-042-B
Detailed Inspection of Thrust Reverser Forward Frame to 3/9 O'clock Beam Joint
Refer to the MPD TASK: 783003-01
DETAILED INSPECTION OF THRUST REVERSER FORWARD FRAME TO 3/9 O'CLOCK BEAM JOINT
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 78-32-00-941-066-A ** ON A/C NOT FOR ALL
Subtask 78-32-00-210-065-A ** ON A/C NOT FOR ALL
Subtask 78-32-00-410-199-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:25:42 UTC
Detailed Inspection of Thrust Reverser Forward Frame to 3/9 O'clock Beam Joint
NOTE: For maintenance planning purposes, this TASK should be accomplished at the same time as the MPD TASKS 783001-01-1, 783002-01-1, 783004-01-1 and 783004-02-1.
ZONE: 400
1. Reason for the JobRefer to the MPD TASK: 783003-01
DETAILED INSPECTION OF THRUST REVERSER FORWARD FRAME TO 3/9 O'CLOCK BEAM JOINT
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 78-32-00-941-066-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 78-32-00-010-210-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL, 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL, 448AR.
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 78-32-00-040-134-A ** ON A/C NOT FOR ALL Subtask 78-32-00-010-211-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL, 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL, 448AR.
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL, 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL, 462AR.
Subtask 78-32-00-010-228-A ** ON A/C NOT FOR ALL (1) FOR [1000EM1] (ENGINE-1)
451AL, 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL, 462AR.
E. Get access to the inspection zone. CMM 783236 , Repair No. 4 (Corrosion Inspection, Removal Limits & Rework 3 and 9 O'clock Beam Fittings).
4. ProcedureSubtask 78-32-00-210-065-A ** ON A/C NOT FOR ALL
A. Do a detailed visual inspection of the thrust reverser forward frame to 3/9 o'clock beam joint. CMM 783236 , Repair No. 4 (Corrosion Inspection, Removal Limits & Rework 3 and 9 O'Clock Beam Fittings).
5. Close-upSubtask 78-32-00-410-199-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Do the close access procedure at the inspection zone.CMM 783236 , Repair No. 4 (Corrosion Inspection, Removal Limits & Rework 3 and 9 O'clock Beam Fittings).
(3) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL, 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL, 462AR.
(4) Remove the access platform(s).
Subtask 78-32-00-440-126-A ** ON A/C NOT FOR ALL Subtask 78-32-00-410-200-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Do the close access procedure at the inspection zone.
(3) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL, 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL, 462AR.
(4) Remove the access platform(s).