1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 75-32-52-860-052-A ** ON A/C NOT FOR ALL
Subtask 75-32-52-630-052-A ** ON A/C NOT FOR ALL
Subtask 75-32-52-410-058-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 13:00:40 UTC
Installation of the HPC Stage 7 Bleed Valve - Lower Left
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V02-126) | lockwire |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 71-00-00-710-017-B | Ground Test Requirements after Power Plant Module/Component Repair or Replacement Procedures |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 75-32-52-700-011-A | Functional Test of the HPC Stage 7 Bleed Valve with Test Set IAE2R19437 |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-32-00-010-010-A | Opening of the Thrust Reverser Halves |
| TASK 78-32-00-410-010-A | Closing of the Thrust Reverser Halves |
Subtask 75-32-52-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 75-32-52-010-059-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the left thrust reverser door is open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL
(b) FOR [1000EM2] (ENGINE-2)
461AL
Subtask 75-32-52-040-052-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the left thrust reverser door is open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL
(b) FOR [1000EM2] (ENGINE-2)
461AL
C. Make sure that the thrust reverser Hydraulic Control Unit (HCU) is deactivated (Ref. AMM TASK 78-30-00-040-012).
4. ProcedureSubtask 75-32-52-630-052-A ** ON A/C NOT FOR ALL
A. Remove all the covers/caps/plugs from the openings.
Subtask 75-32-52-160-052-A ** ON A/C NOT FOR ALL B. Make sure all the mating faces are clean.
Subtask 75-32-52-410-054-A ** ON A/C NOT FOR ALL C. Attach the Seal Carrier and the Silencer
PRE SBE 75-0071
(1) Put the seal carrier (1) in position on the bottom face of the bleed valve (5) top flange.
(2) Put the silencer (4) in position on the top face of the bleed valve top flange.
(3) Attach the valve and the silencer to the seal carrier with the bolts (3).
END OF PRE SBE 75-0071
Subtask 75-32-52-420-054-A ** ON A/C NOT FOR ALL PRE SBE 75-0071
(1) Put the seal carrier (1) in position on the bottom face of the bleed valve (5) top flange.
(2) Put the silencer (4) in position on the top face of the bleed valve top flange.
(3) Attach the valve and the silencer to the seal carrier with the bolts (3).
NOTE: Do not fully tighten the bolts at this step of the procedure.
END OF PRE SBE 75-0071
D. Attach the silencer assembly
POST SBE 75-0071 and PRE SBE 75-0105
(1) Put the silencer assembly (10) in position on the top face of the bleed valve (9) top flange.
(2) Attach the silencer assembly (10) to the bleed valve (9) with the bolts (8) and the nuts (7).
END OF POST SBE 75-0071 and END OF PRE SBE 75-0105
POST SBE 75-0105
(3) Put the silencer assembly (14) in position on the top face of the bleed valve (12) top flange.
(4) Attach the silencer assembly (14) to the bleed valve (12) with the bolts (13) and the nuts (16).
END OF POST SBE 75-0105
Subtask 75-32-52-420-052-A ** ON A/C NOT FOR ALL POST SBE 75-0071 and PRE SBE 75-0105
(1) Put the silencer assembly (10) in position on the top face of the bleed valve (9) top flange.
(2) Attach the silencer assembly (10) to the bleed valve (9) with the bolts (8) and the nuts (7).
NOTE: Do not fully tighten the nuts at this step of the procedure.
END OF POST SBE 75-0071 and END OF PRE SBE 75-0105
POST SBE 75-0105
(3) Put the silencer assembly (14) in position on the top face of the bleed valve (12) top flange.
(4) Attach the silencer assembly (14) to the bleed valve (12) with the bolts (13) and the nuts (16).
END OF POST SBE 75-0105
NOTE: Do not fully tighten the nuts at this step of the procedure.
E. Installation of the Bleed Valve
PRE SBE 75-0071
(1) Put the valve (5) in position on the support duct flange.
(2) Align the air operation connector on the valve with the air operation tube (6).
(3) Attach the valve to the support duct flange with the bolts (2).
(4) TORQUE the bolts to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF PRE SBE 75-0071
POST SBE 75-0071 and PRE SBE 75-0105
(5) Put the valve (9) in position on the support duct flange.
(6) Align the air operation connector on the valve with the air operation tube (6).
(7) Attach the valve to the support duct flange with the bolts (11).
(8) TORQUE the bolts to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF POST SBE 75-0071 and END OF PRE SBE 75-0105
POST SBE 75-0105
(9) Put the valve (12) in position on the support duct flange.
(10) Align the air operation connector on the valve with the air operation tube(6).
(11) Attach the valve (12) to the support duct flange with the bolts (15).
(12) TORQUE the bolts (15) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF POST SBE 75-0105
(13) Connect the air operation tube.
(a) Attach the tube (6) to the bleed valve connector.
(b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(c) Safety the connector with the lockwire (Material No.V02-126) .
PRE SBE 75-0071
(14) TORQUE the bolts (3) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF PRE SBE 75-0071
POST SBE 75-0071 and PRE SBE 75-0105
(15) TORQUE the nuts (7) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF POST SBE 75-0071 and END OF PRE SBE 75-0105
POST SBE 75-0105
(16) TORQUE the nuts (16) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
END OF POST SBE 75-0105
5. Close-upPRE SBE 75-0071
(1) Put the valve (5) in position on the support duct flange.
(2) Align the air operation connector on the valve with the air operation tube (6).
(3) Attach the valve to the support duct flange with the bolts (2).
(4) TORQUE the bolts to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF PRE SBE 75-0071
POST SBE 75-0071 and PRE SBE 75-0105
(5) Put the valve (9) in position on the support duct flange.
(6) Align the air operation connector on the valve with the air operation tube (6).
(7) Attach the valve to the support duct flange with the bolts (11).
(8) TORQUE the bolts to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF POST SBE 75-0071 and END OF PRE SBE 75-0105
POST SBE 75-0105
(9) Put the valve (12) in position on the support duct flange.
(10) Align the air operation connector on the valve with the air operation tube(6).
(11) Attach the valve (12) to the support duct flange with the bolts (15).
(12) TORQUE the bolts (15) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF POST SBE 75-0105
(13) Connect the air operation tube.
(a) Attach the tube (6) to the bleed valve connector.
(b) TORQUE the connector to between 177 and 159 lbf.in (2.00 and 1.80 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (c) Safety the connector with the lockwire (Material No.V02-126) .
PRE SBE 75-0071
(14) TORQUE the bolts (3) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF PRE SBE 75-0071
POST SBE 75-0071 and PRE SBE 75-0105
(15) TORQUE the nuts (7) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF POST SBE 75-0071 and END OF PRE SBE 75-0105
POST SBE 75-0105
(16) TORQUE the nuts (16) to between 105 and 85 lbf.in (1.19 and 0.96 m.daN )
(Ref. AMM TASK 70-23-11-911-013). END OF POST SBE 75-0105
Subtask 75-32-52-410-058-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the left thrust reverser half (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL
(b) FOR [1000EM2] (ENGINE-2)
461AL
Subtask 75-32-52-440-053-A ** ON A/C NOT FOR ALL Subtask 75-32-52-410-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the left thrust reverser half (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL
(b) FOR [1000EM2] (ENGINE-2)
461AL
C. Close Access
(1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
Subtask 75-32-52-720-052-C ** ON A/C NOT FOR ALL (1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
D. Do a test of the HPC stage 7 bleed valve (Ref. AMM TASK 75-32-52-700-011) or (Ref. AMM TASK 71-00-00-710-017).