Installation of the EEC Blower Fire Shield Blanket (PRE SB72-0191) [CFML]


TASK 75-24-05-400-803-A
Installation of the EEC Blower Fire Shield Blanket (PRE SB72-0191)


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M(3 FT)
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL, 438AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-803-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-803-A
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 75-24-05-941-056-A
A. Safety Precautions
   (1) On the center pedestal, on ENG panel 115VU:
     (a) Make sure that the ENG/MODE selector switch is in the NORM position.
     (b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
     (c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
  • The ENG/MODE selector switch
  • The ENG/MASTER 1(2) control switch.
   (2) On the ENG section of maintenance panel 50VU:
     (a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 75-24-05-010-056-A
B. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
   (2) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 75-24-05-865-057-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUEEC BLOWER/ENG290KS2M44
121VUEEC BLOWER/ENG190KS1P44
4. Procedure
Subtask 75-24-05-420-052-A
A. Installation of the Electronic Engine Control (EEC) Blower Fire Shield Blanket
   (1) Install the EEC blower fire shield blanket (2) on the two blowers (1) in order to cover them completely.
NOTE: Install the Velcro fastening of the EEC blower fire shield blanket radially outward (Velcro fastening facing nacelle).
5. Close-up
Subtask 75-24-05-865-058-A
A. Close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUEEC BLOWER/ENG290KS2M44
121VUEEC BLOWER/ENG190KS1P44
Subtask 75-24-05-410-053-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).