W DOC AIRBUS | AMM A320F

Removal of the J12 Harness [CFMI]


TASK 73-21-50-000-011-A
Removal of the J12 Harness


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
This harness connects the Electronic Control Unit (ECU) to 6 o'clock junction box on core engine.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR, 451AL, 452AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR, 461AL, 462AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 78-30-00-481-041-A
Make the Thrust Reverser Unserviceable for Maintenance
TASK 78-36-00-010-040-A
Opening of the Thrust Reverser Doors
3. Job Set-up
Subtask 73-21-50-941-060-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 73-21-50-010-060-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
   (2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 73-21-50-040-070-A ** ON A/C NOT FOR ALL
C. Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-481-041).
Subtask 73-21-50-010-086-A ** ON A/C NOT FOR ALL
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
   (1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
   (2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure
Subtask 73-21-50-020-102-A ** ON A/C NOT FOR ALL
A. Removal of the J12 Harness
   (1) Disconnect the J12 electrical harness from the ECU.
   (2) Disconnect the 2 branches (CJ12R and CJ12L) of the electrical harness J12 in the 6 o'clock junction box.

PRE SB 72-169

   (3) Remove the 2 bolts (82) and nuts (84) which attach the cover plate (85) to the brackets at the 5 o'clock location on the flanges G and E (detail A). Pull out the flexible clamp assembly from the brackets and pull out the J12 harness from the flexible clamp (81). Re-install the clamp assembly.

POST SB 72-169

   (4) Remove the 2 bolts (82) and nuts (84) which attach the cover plate (85) to the brackets at the 5 o'clock location on the flanges G and E (detail A), with clamp (83) of J15 harness. Pull out the J12 harness from the flexible clamp (81). Re-install the clamp assembly.

END OF SB 72-169

   (5) Remove the 2 bolts (129) which attach the cover plate (127) to the right leg of the bracket at the 5:30 o'clock location between flanges E and G (detail B). Remove the clamp assembly and remove the J12 harness from the flexible clamp (128). Re-install clamp assembly.

PRE SB 72-232

   (6) Remove the 2 bolts (132) which attach the cover plate (133) to the right bracket of the Transfer Gearbox (TGB) (detail C). Remove the cover plate and remove the J12 harness from the flexible clamp (130).

POST SB 72-232

   (7) Remove the 2 bolts (132) and washers (131) which attach the cover plate (133) to the right bracket on the TGB (detail C). Remove the cover plate and remove the J12 harness from the flexible clamp (130).

PRE SB 72-232

   (8) Remove the 2 bolts (201) which attach the cover plate (204) to the rear right bracket of the TGB (detail D). Remove the cover plate and the 2 leads of the J12 harness from the flexible clamp (203).

POST 72-232

   (9) Remove the 2 bolts (201) and washers (202) which attach the cover plate (204) to the rear right bracket of the TGB (detail D). Remove the cover plate and remove the 2 leads of the J12 harness from the flexible clamp (203).

PRE SB 72-200

   (10) Remove bolts (205) and (206) which attach the J13 bracket and the cover plate (207) to the rear bracket of TGB (detail E). Remove the flexible clamp assembly. Remove the 2 leads of the J12 harness from the flexible clamp (208). Re-install the flexible clamp assembly.

POST SB 72-200

   (11) Remove bolts (205) and (206) which attach the J13 bracket and the cover plate (209) to the rear bracket of TGB (detail E). Remove the cover plate, open the flexible clamp and remove the 2 leads of the J12 harness from the flexible clamp (210).
   (12) Remove the 2 leads of the J12 harness from the clips on the rear face of the 6 o'clock strut (detail F).
   (13) Remove J12 harness.
   (14) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
[Rev.10 from 2021] 2026.04.01 02:56:33 UTC