Removal of the CJ13 Harness [CFMI]


TASK 73-21-50-000-005-A
Removal of the CJ13 Harness


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
This harness is connected to the J13 harness (in the 6 o'clock junction box), the T495 main junction box, the T3 temperature sensor, the T5 temperature sensor and 2 High Pressure Turbine (HPT) case temperature sensors.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR, 451AL, 452AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR, 461AL, 462AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 78-30-00-481-041-A
Make the Thrust Reverser Unserviceable for Maintenance
TASK 78-36-00-010-040-A
Opening of the Thrust Reverser Doors
3. Job Set-up
Subtask 73-21-50-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 73-21-50-010-054-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 73-21-50-040-058-A ** ON A/C NOT FOR ALL
C. Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-481-041).
Subtask 73-21-50-010-074-A ** ON A/C NOT FOR ALL
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
   (1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
   (2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure
Subtask 73-21-50-020-096-B ** ON A/C NOT FOR ALL
A. Removal of the CJ13 Harness
   (1) Disconnect the electrical harness from the T495 main junction box, the T3 temperature sensor, the T5 temperature sensor and the 2 HPT case temperature sensors.

PRE CFM SB 72-076

   (2) Disconnect the J13 harness from the CJ13 harness receptacle in the 6 o'clock junction box. Remove the nut which attaches the receptacle (detail A). Remove O-ring (41).

END OF PRE CFM SB 72-076

POST CFM SB 72-076

   (3) Disconnect the J13 harness from the CJ13 harness receptacle in the 6 o'clock junction box. Remove the nut (40) which attaches the receptacle (detail A). Remove lockwasher (42). Remove O-ring (41).

END OF POST CFM SB 72-076

   (4) Remove the bolts and nuts which attach the 4 harness clamps to the brackets between the main harness junction box and the T3 sensor connector (details F, H and S).

PRE CFM SB 72-019

   (5) Remove the bolts (49) and nuts (51) which attach the harness clamps to the bracket (detail G).

END OF PRE CFM SB 72-019

POST CFM SB 72-019

   (6) Remove the bolts (49) which attach the harness clamps to the bracket (detail G).

END OF POST CFM SB 72-019

PRE CFM SB 73-0129

   (7) Remove the bolts and nuts which attach the 4 harness clamps to the brackets between the main harness junction box and the T495 sensor connector and the Higth Pressure Turbine Active Clearance Control (HPTACC) sensor connector at the 9 o'clock location (details J, K, L and M).

END OF PRE CFM SB 73-0129

POST CFM SB 73-0129

   (8) Remove the bolts and nuts which attach the 3 harness clamps to the brackets between the main harness junction box and the T495 sensor connector at the 9 o'clock location (details J, L and M).

END OF POST CFM SB 73-0129

PRE CFM SB 72-169

   (9) Not applicable.

END OF PRE CFM SB 72-169

POST CFM SB 72-169

   (10) Keep the spacer (detail J), configuration 2.

END OF POST CFM SB 72-169

   (11) Keep the spacer (64) (detail M), configuration 2.

POST CFM SB 72-060 or POST CFM SB 72-065

   (12) Not applicable.

END OF POST CFM SB 72-060 or POST CFM SB 72-065

   (13) Remove the bolts and nuts which attach the 4 harness clamps to the bracket between the main harness junction box and the T5 sensor connector and HPTCC connector at the 3 o'clock location (details N, T, P and Q). Keep the spacer (detail N).
   (14) Remove the bolt (80) which attaches the harness clamp to the bracket between the main harness junction box and the 6 o'clock junction box connector (detail R).
   (15) Remove the bolts which attach the 4 harness junction boxes to the brackets (details B, C, D and E).
   (16) Carefully remove the CJ13 harness.
   (17) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (18) Remove all the clamps from the harness.