Replacement of the Actuation Ring Flanged Bushing (Stages 1 and 2) [CFMB]
TASK 72-32-00-960-002-A
Replacement of the Actuation Ring Flanged Bushing (Stages 1 and 2)
1. Reason for the Job
To replace missing actuation ring bushings.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 72-32-00-941-057-A ** ON A/C NOT FOR ALL
Subtask 72-32-00-410-064-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:42:28 UTC
Replacement of the Actuation Ring Flanged Bushing (Stages 1 and 2)
1. Reason for the Job
To replace missing actuation ring bushings.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2267) | RTV 106 |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 1 | BUSHING | AIPC 72-32-00-02-080 |
| 1 | BUSHING | AIPC 72-32-00-02-090 |
| 2 | BUSHING | AIPC 72-32-00-02-100 |
| 2 | BUSHING | AIPC 72-32-00-02-110 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 72-32-00-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 72-32-00-010-068-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
Subtask 72-32-00-040-061-A ** ON A/C NOT FOR ALL Subtask 72-32-00-010-069-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 1M(3 FT) in position.
D. Open the thrust reverser doors: (Ref. AMM TASK 78-36-00-010-040)
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(a) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(a) FOR [1000EM2] (ENGINE-2)
461AL 462AR
CAUTION:
DO NOT REMOVE THE LEVER ARMS TO COMPLETE THIS REPAIR.
Subtask 72-32-00-420-055-A ** ON A/C NOT FOR ALL A. Install the new actuation ring lever arm bushing
(1) If necessary, clean the pieces of old bushing from the ring.
(3) Installation of the bushing
(a) For stage 1:
1 Install the new AIPC 72-32-00-02-080 BUSHING (1) or AIPC 72-32-00-02-090 BUSHING (1) from outboard side of the actuation ring.
(b) For stage 2:
1 Install the new AIPC 72-32-00-02-100 BUSHING (2) or AIPC 72-32-00-02-110 BUSHING (2) from outboard side of the actuation ring.
(5) Permit the RTV 106 to cure for not less than 24 hours before you operate the engine.
5. Close-up(1) If necessary, clean the pieces of old bushing from the ring.
NOTE: The new bushing cannot be inserted onto the lever arm with the legs attached.
NOTE: The actuation ring is assembled with different types of bushings. Be sure to select the correct bushing from the Illustrated Parts Catalog.
(2) Carefully, break the 4 'legs' off of the new bushing. (3) Installation of the bushing
(a) For stage 1:
1 Install the new AIPC 72-32-00-02-080 BUSHING (1) or AIPC 72-32-00-02-090 BUSHING (1) from outboard side of the actuation ring.
(b) For stage 2:
1 Install the new AIPC 72-32-00-02-100 BUSHING (2) or AIPC 72-32-00-02-110 BUSHING (2) from outboard side of the actuation ring.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(4) Apply approximately 0.125 in. (3.18 mm) RTV 106 (Material No.CP2267) to the outer flange of the bushing. (5) Permit the RTV 106 to cure for not less than 24 hours before you operate the engine.
Subtask 72-32-00-410-064-A ** ON A/C NOT FOR ALL
A. Close access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors: (Ref. AMM TASK 78-36-00-410-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-32-00-440-057-A ** ON A/C NOT FOR ALL Subtask 72-32-00-410-065-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors: (Ref. AMM TASK 78-36-00-410-040)
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Replacement of the Stages 1 and 2 Actuation Ring Flanged Bushing