Visual Inspection of the Aft Acoustical Panel [CFML]
TASK 72-23-04-210-801-A
Visual Inspection of the Aft Acoustical Panel
This procedure gives the visual inspection criteria for the aft acoustic panels.
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-23-04-941-050-A
Subtask 72-23-04-210-050-A
Subtask 72-23-04-410-051-A
[Rev.10 from 2021]
2026.04.01 13:03:36 UTC
Visual Inspection of the Aft Acoustical Panel
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the JobThis procedure gives the visual inspection criteria for the aft acoustic panels.
NOTE: The inspection criteria below are applicable after the removal of the high metal.
NOTE: You can use equivalent alternatives for standard tools, equipment and consumable materials.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 447AL, 448AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 72-23-04-000-801-A | Removal of the Aft Acoustical Panel |
| TASK 72-23-04-400-801-A | Installation of the Aft Acoustical Panel |
Subtask 72-23-04-941-050-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put a WARNING NOTICE(S) in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 72-23-04-010-050-A 4. Procedure(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put a WARNING NOTICE(S) in position to tell persons not to operate:
- The ENG/MODE selector switch
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 72-23-04-210-050-A
A. Visual Inspection of the visible areas of the Aft Acoustic Panels
5. Close-up| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.Visual inspection of the inner surfaces of the panel | | |
| A.Local blind multi-perforations | Any amount | |
| B.Erosion | 0.008 in. (0.2 mm) in depth on all surfaces | |
| C.Nicks, dents, scratches, impact marks on cups | 0.004 in. (0.1 mm) in depth | |
| D.Nicks, dents, scratches, cracks, flaking of the protective coating | 0.008 in. (0.2 mm) in depth on all surfaces | |
| E.Tears, punctures, cracks of protective coating | 0.008 in. (0.2 mm) in depth on all surfaces | |
| F.Missing of the protective coating | Any amount | |
| G.Nicks, dents, scratches, impact marks on carbon plies |
| |
| H.Tears, cracks, punctures on the carbon plies | Not serviceable | Replace the aft acoustic panel (1) (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| J.Local collapse of the surface | Not serviceable | Replace the aft acoustic panel (1) (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| J. Unbonded, missing cup | Not serviceable | Replace the cup (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| K.Missing screw | Not serviceable | Replace the screw (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| L.Missing spacer | Not serviceable | Replace the spacer (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| M.Missing aft acoustic panel (1) | Not serviceable | Replace the aft acoustic panel (1) (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| 2.Visual examination of the edges of the panel | | |
| A.Nicks, dents, scratches, impact marks on the carbon plies | 0.008 in. (0.2 mm) in depth | |
| B.Tears, cracks, punctures on carbon plies | Not serviceable | Replace the aft acoustic panel (1) (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
| C.Local collapse of surface | Not serviceable | Replace the aft acoustic panel (1) (Ref. AMM TASK 72-23-04-000-801) and (Ref. AMM TASK 72-23-04-400-801). |
Subtask 72-23-04-410-051-A
Aft Acoustical Panel