Installation of the FlowPath Panel [CFML]
TASK 72-21-01-400-802-A
Installation of the FlowPath Panel
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-21-01-941-054-A
Subtask 72-21-01-420-050-A
Subtask 72-21-01-410-050-A
[Rev.10 from 2021]
2026.04.01 02:51:27 UTC
Installation of the FlowPath Panel
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 1 | HOT AIR BLOWER MAX OPERATING 370 DEG C (700 DEG F) |
| No specific | AR | WARNING NOTICE(S) |
| 956A7014 | 1 | FIXTURE, REMOVE/INSTALL - PANEL FLOW PATH |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
| TASK 72-21-03-400-801-A | Installation of the Ring Half Flowpath Fairing |
Subtask 72-21-01-941-054-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 72-21-01-010-051-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
- The ENG/MODE selector switch, and
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(2) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
4. Procedure(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(2) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 72-21-01-420-050-A
A. Installation of the Flowpath Panel (1)
(2) Install the 956A7014 FIXTURE, REMOVE/INSTALL - PANEL FLOW PATH on the flowpath panel (1).
(3) Heat the flowpath panel (1) to 212 deg.F (100.0 deg.C) with the HOT AIR BLOWER MAX OPERATING 370 DEG C (700 DEG F).
(4) Install the flowpath panel (1) in the correct position on the engine.
(5) Make sure that the seal (4) of the flowpath panel is installed in the groove of the Outlet Guide Vane (OGV).
(6) Remove the 956A7014 FIXTURE, REMOVE/INSTALL - PANEL FLOW PATH from the flowpath panel (1).
(7) Install the ring half flowpath fairing (2) (Ref. AMM TASK 72-21-03-400-801).
5. Close-upWARNING:
USE THERMAL GLOVES WHEN YOU MOVE OR TOUCH HOT OR COLD PARTS. HOT OR COLD PARTS CAN CAUSE INJURY.
(1) Make sure that the mating surfaces are clean and clear of unwanted materials. (2) Install the 956A7014 FIXTURE, REMOVE/INSTALL - PANEL FLOW PATH on the flowpath panel (1).
(3) Heat the flowpath panel (1) to 212 deg.F (100.0 deg.C) with the HOT AIR BLOWER MAX OPERATING 370 DEG C (700 DEG F).
(4) Install the flowpath panel (1) in the correct position on the engine.
(5) Make sure that the seal (4) of the flowpath panel is installed in the groove of the Outlet Guide Vane (OGV).
(6) Remove the 956A7014 FIXTURE, REMOVE/INSTALL - PANEL FLOW PATH from the flowpath panel (1).
(7) Install the ring half flowpath fairing (2) (Ref. AMM TASK 72-21-03-400-801).
Subtask 72-21-01-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
FlowPath Panel