Air Flow Check of the Aft Sump Oil Supply Circuit [CFMB]
TASK 72-00-00-820-006-A
Air Flow Check of the Aft Sump Oil Supply Circuit
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 72-00-00-941-108-A ** ON A/C NOT FOR ALL
Subtask 72-00-00-820-051-A ** ON A/C NOT FOR ALL
Subtask 72-00-00-410-149-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:40:27 UTC
Air Flow Check of the Aft Sump Oil Supply Circuit
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CONTAINER 3 L(3/4 USGAL) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 50 and 45 lbf.in (0.57 and 0.51 m.daN ) ![]() | |
| No specific | Torque wrench: range to between 275 and 225 lbf.in (3.11 and 2.54 m.daN ) ![]() | |
| No specific | Torque wrench: range to between 300 and 270 lbf.in (3.39 and 3.05 m.daN ) ![]() | |
| 856A3267 | 1 | ADAPTER, TEST RIG - AIR FLOW CHECK |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-13-79-610-002-A | Check oil level and replenish Check Pop Out Indicator of EMCD (Electrical Master Chip Detector) |
| TASK 12-13-79-610-002-A-01 | Check oil level and replenish (Pressure Filling) |
| TASK 71-00-00-710-006-B | Minimum Idle Check |
| TASK 71-00-00-820-002-A | Oil Circuit Air Flow Check |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 72-00-00-941-108-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 72-00-00-010-150-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 72-00-00-040-082-A ** ON A/C NOT FOR ALL Subtask 72-00-00-010-151-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(2) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(3) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(4) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-00-00-820-051-A ** ON A/C NOT FOR ALL
A. Aft Sump Air Flow Check
(2) Remove nuts (60) and (180), bolts (70) and (160) which attach clamps (80) and (170) to the oil supply tube (20).
(3) Remove clamps (80), (170) and shields (90) and (190).
(4) Remove the aft sump oil supply tube as follows:
(b) Remove the nut (50) and the bolt (30) which attaches the clamps (40) and (110) to the bracket (100) on flange S.
(c) Disconnect the oil supply tube (20) from the oil supply tube (10) and from the aft sump oil supply tube (30).
(d) Remove oil supply tube (20).
(5) Install a fitting reducer 0.750-16 and 0.5625-18 THD (19 and 14.3 mm) to the end of the aft sump oil supply tube (30).
(6) Connect the test rig equipped with 856A3267 ADAPTER, TEST RIG - AIR FLOW CHECK (856A3267G02), to the fitting reducer.
(7) TORQUE the union nuts to between to between 275 and 225 lbf.in (3.11 and 2.54 m.daN )
.
(8) Do the check of the aft sump oil supply circuit (Ref. AMM TASK 71-00-00-820-002).
(9) If the measured flow rate is not within the limits, do the cleaning of the oil inlet cover, and do the cleaning of the aft sump oil supply tube.
(10) Disconnect the test rig from the fitting reducer.
(11) Remove the fitting reducer from the aft sump oil supply tube (30).
(12) Install the aft sump oil supply tube (20) as follows:
(b) Tighten the coupling nuts by hand.
(c) Install clamps (120) and (170) on the oil supply tube (20).
(d) Lubricate threads of bolt (30) and (130) with graphite grease (Material No.CP2101) .
(e) Attach clamps (120) and (140) to the bracket (150) on flange T, with bolt (130).
(f) Attach clamps (40) and (110) to the bracket (100) on flange S, with bolt (30) and nut (50).
(g) Make sure that the oil tube (20) is not strained.
(h) TORQUE the bolt (30) and (130) to to between 50 and 45 lbf.in (0.57 and 0.51 m.daN )
.
(i) TORQUE the coupling nuts of tubes (20) and (30) to to between 300 and 270 lbf.in (3.39 and 3.05 m.daN )
.
(j) Lubricate threads of bolt (70) and (160) with graphite grease (Material No.CP2101) .
(k) Install shields (90) and (190) on couplings of the oil tube (20), with clamps (80) and (170), bolts (70) and (160), and nuts (60) and (180).
.
5. Close-upWARNING:
USE PROTECTIVE GLOVES AND BE CAREFUL WITH OIL SPLASHES WHEN YOU DISCONNECT OIL TUBES. HOT OIL CAN CAUSE DEEP BURNS.
(1) Put a CONTAINER 3 L(3/4 USGAL) under the junctions of the oil supply tube (20). (2) Remove nuts (60) and (180), bolts (70) and (160) which attach clamps (80) and (170) to the oil supply tube (20).
(3) Remove clamps (80), (170) and shields (90) and (190).
(4) Remove the aft sump oil supply tube as follows:
CAUTION:
USE TWO WRENCHES TO REMOVE OR INSTALL THE TUBE COUPLING NUTS:
(a) Remove the bolt (130) which attaches the clamps (120) and (140) to the bracket (150) on flange T. - ONE WRENCH TO HOLD THE UNION, AND
- ONE TO LOOSEN OR TIGHTEN THE COUPLING NUT.
(b) Remove the nut (50) and the bolt (30) which attaches the clamps (40) and (110) to the bracket (100) on flange S.
(c) Disconnect the oil supply tube (20) from the oil supply tube (10) and from the aft sump oil supply tube (30).
(d) Remove oil supply tube (20).
(5) Install a fitting reducer 0.750-16 and 0.5625-18 THD (19 and 14.3 mm) to the end of the aft sump oil supply tube (30).
(6) Connect the test rig equipped with 856A3267 ADAPTER, TEST RIG - AIR FLOW CHECK (856A3267G02), to the fitting reducer.
(7) TORQUE the union nuts to between to between 275 and 225 lbf.in (3.11 and 2.54 m.daN )
. (8) Do the check of the aft sump oil supply circuit (Ref. AMM TASK 71-00-00-820-002).
(9) If the measured flow rate is not within the limits, do the cleaning of the oil inlet cover, and do the cleaning of the aft sump oil supply tube.
(10) Disconnect the test rig from the fitting reducer.
(11) Remove the fitting reducer from the aft sump oil supply tube (30).
(12) Install the aft sump oil supply tube (20) as follows:
CAUTION:
USE TWO WRENCHES TO REMOVE OR INSTALL THE TUBE COUPLING NUTS:
(a) Connect the oil supply tube (20) to the oil supply tube (10) and to the aft sump oil supply tube (30). - ONE WRENCH TO HOLD THE UNION, AND
- ONE TO LOOSEN OR TIGHTEN THE COUPLING NUT.
(b) Tighten the coupling nuts by hand.
(c) Install clamps (120) and (170) on the oil supply tube (20).
(d) Lubricate threads of bolt (30) and (130) with graphite grease (Material No.CP2101) .
(e) Attach clamps (120) and (140) to the bracket (150) on flange T, with bolt (130).
(f) Attach clamps (40) and (110) to the bracket (100) on flange S, with bolt (30) and nut (50).
(g) Make sure that the oil tube (20) is not strained.
(h) TORQUE the bolt (30) and (130) to to between 50 and 45 lbf.in (0.57 and 0.51 m.daN )
. (i) TORQUE the coupling nuts of tubes (20) and (30) to to between 300 and 270 lbf.in (3.39 and 3.05 m.daN )
. (j) Lubricate threads of bolt (70) and (160) with graphite grease (Material No.CP2101) .
(k) Install shields (90) and (190) on couplings of the oil tube (20), with clamps (80) and (170), bolts (70) and (160), and nuts (60) and (180).
NOTE: The nut (180) must be installed on the turbine frame side.
(l) TORQUE the nuts (60) and (180) to to between 50 and 45 lbf.in (0.57 and 0.51 m.daN )
. Subtask 72-00-00-410-149-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-00-00-710-061-A ** ON A/C NOT FOR ALL Subtask 72-00-00-610-055-A ** ON A/C NOT FOR ALL Subtask 72-00-00-440-082-A ** ON A/C NOT FOR ALL Subtask 72-00-00-410-150-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Air Flow Check of the Aft Sump Oil Supply Circuit