Off-Schedule Vane Replacement [CFMB]
TASK 72-00-00-200-009-A
Off-Schedule Vane Replacement
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-00-00-941-070-A ** ON A/C NOT FOR ALL
Subtask 72-00-00-210-070-A ** ON A/C NOT FOR ALL
Subtask 72-00-00-410-076-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:40:45 UTC
Off-Schedule Vane Replacement
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
| TASK 78-36-00-410-040-B | Closing of the Thrust Reverser Doors |
Subtask 72-00-00-941-070-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 72-00-00-010-077-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 72-00-00-040-062-A ** ON A/C NOT FOR ALL Subtask 72-00-00-010-082-A ** ON A/C NOT FOR ALL (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
D. Open the thrust reverser doors (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(2) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-00-00-210-070-A ** ON A/C NOT FOR ALL
A. Vane scheduling errors can occur if the lever arms which control the compressor stator vanes are damaged or disassembled.
(1) When the vane scheduling errors are greater than 4 degrees, you must replace all HPC blades on one stage forward of and 2 stages aft of the stage which has off-schedule vanes.
5. Close-up(1) When the vane scheduling errors are greater than 4 degrees, you must replace all HPC blades on one stage forward of and 2 stages aft of the stage which has off-schedule vanes.
Subtask 72-00-00-410-076-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 72-00-00-440-062-A ** ON A/C NOT FOR ALL Subtask 72-00-00-410-081-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser doors (Ref. AMM TASK 78-36-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR