W DOC AIRBUS | AMM A320F

Installation of the Integrated Drive Generator (IDG) Control and Anti-ice Harness 238W0904 [CFMI]


TASK 71-51-44-400-003-A
Installation of the Integrated Drive Generator (IDG) Control and Anti-ice Harness 238W0904


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 25 and 20 lbf.ft (3.39 and 2.71 m.daN ) T
No specific
Torque wrench: range to between 22 and 20 lbf.in (0.25 and 0.23 m.daN ) T
No specific
Torque wrench: range to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
No specific
Safety wire 0.020 in Dia. nickel chromium iron alloy (MS20995N20)
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-21-00-710-040-A
Operational Test of the IDG Disconnect and Reconnect Function - Engine Static
TASK 24-21-00-720-041-A
Operational Test of the Integrated Drive Generator (IDG) Disconnect and Reconnect (Reset) Function - Engine in Operation
TASK 30-21-00-710-001-A
Operational Check of the Engine-Anti-Ice System Fault-Warning
TASK 70-60-00-910-042-A
Nacelle Standard Practices
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-A
Closing of the Fan Cowl Doors
TASK 73-25-34-710-040-A
Operational Test of the Engine Interface Unit
3. Job Set-up
Subtask 71-51-44-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
   (3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 71-51-44-010-055-A ** ON A/C NOT FOR ALL
B. Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-040):
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 71-51-44-865-057-A ** ON A/C NOT FOR ALL
WARNING: OPEN THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) BEFORE ENG1(2)FADEC A and EIU 1(2) C/B'S 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE:
  • THE PROBES WILL BECOME TOO HOT.
  • THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUCOM/CVR/SPLY2RKE14
49VUCOM/CVR/CTL4RKE13
121VURCDR/DFDR7TUK16
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
FOR FIN: 1000EM1 (ENGINE1)
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUELEC/GCU/12XU1T26
FOR FIN: 1000EM2 (ENGINE2)
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
122VUELEC/GCU/22XU2T27
4. Procedure
Subtask 71-51-44-420-052-A ** ON A/C NOT FOR ALL
A. Installation of the IDG Control and Anti-ice Harness 238W0904
NOTE: To tighten the flip-lock clamps and hinged line blocks, turn the captive screws 1/4 turn clockwise to engage the cam nuts.
NOTE: Refer to the recommended procedure for the installation of the wire harness (Ref. AMM TASK 70-60-00-910-042).
   (1) Remove the protective covers from the electrical connectors.
   (2) Put the electrical harness (5) in position on the engine.
   (3) Connect the electrical connectors 401VC-A, 404VC-A and 405VC-A to the pylon junction box. Tighten the connectors with your hand plus one-eighth turn.
   (4) Connect the electrical connector 4005VC-A to the connector 4005VC. Tighten the connector with your hand plus one-eighth turn.
   (5) Put the harness (5) into the flip-lock clamps (10) and tighten the captive screws.
   (6) Attach the clamp (25), (40) and (60) on the harness (5). Make sure that the clamp (55) is installed on the vibration sensor harness.
   (7) Attach the clamps (25), (40) and (60) to the brackets with the screws (15) and the washers (20).
   (8) Attach the clamp (40) to the bracket with the screw (30), the washer (20) and the spacer (35).
   (9) Attach the clamps (40) and (55) to the bracket with the screw (45), the washer (20) and the nut (50).
NOTE: Detail A shows the most current harness installation that is applicable for some engines. Detail B illustrates the initial harness installation. Refer to the illustrated parts catalog for applicable harness installation configurations.
   (10) Put the harness (5) into the flip-lock clamps (65) and tighten the captive screws.
   (11) Install the clamps (25) and (40) on the harness (5) near flange station 174 (D).
   (12) Attach the clamp (25) to the clamp (40) with the screw (45), the washer (20) and the nut (50).
   (13) Attach the clamps (40) to the brackets with the screws (30), the washers (20) and the spacers (35).
   (14) TORQUE the screws (15) and (30) to between 22 and 20 lbf.in (0.25 and 0.23 m.daN ) T.
   (15) Install the clamps (70), (75) and (80) on the harness (5).
   (16) Attach the clamps to the brackets with the screws (15), washers (20) and the nuts (50).
   (17) TORQUE the nuts (50) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN )
T.
   (18) Put the harness (5) into the line blocks (85) and tighten the captive screws.

POST SB RA32071-81

   (19) Put clamp (95) on harness (5) and attach it to the bracket near the anti-ice valve with the screw (45), the washer (20) and the nut (50).

END OF SB RA32071-81

   (20) Connect the electrical connector 4001VC-A to the interphone jack disconnect. Tighten the connector with your hand plus one-eighth turn.
   (21) Put clamp (55) on connector 4001VC-A wire and attach it to the bracket with the screw (90), the washer (20) and the nut (50).
   (22) Connect the electrical connector 4000DN-A to the anti-ice valve. Tighten the connector with your hand plus one-eighth turn.
   (23) Put clamp (25) on harness (5) and attach it to the bracket with the screw (90) and the washer (20).

POST SB RA32071-65

   (24) Put clamp (105) on harness (5) and attach it to the line block (110) with the screw (100), the washer (20) and the nut (50).

END OF SB RA32071-65

   (25) Connect the electrical connectors 4000XU-A, 4000XU-B and 4000XU-C to the integrated drive generator (IDG). Tighten the connectors with your hand plus one-eighth turn.
   (26) TORQUE the nuts (50) to between 25 and 20 lbf.ft (3.39 and 2.71 m.daN )
T.
   (27) TORQUE the screws (90) to between 22 and 20 lbf.in (0.25 and 0.23 m.daN )
T.
   (28) Connect the ground wires to the plate with the nuts (115), the lockwashers (120) and the washers (125):
GROUND WIRE
GROUND
904037 + SHIELD
GD9958DC
904032 + SHIELD
GD9959DC
904007
GD9960DC
904004 + SHIELD
GD9961DC
904010
GD9962DC
904037 + SHIELD
GD9963DC
   (29) Examine the harness installation and make sure that all clamps and line blocks are installed correctly.
   (30) Safety the connectors and backshells with Safety wire 0.020 in Dia. nickel chromium iron alloy (MS20995N20)
Subtask 71-51-44-865-058-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUCOM/CVR/SPLY2RKE14
49VUCOM/CVR/CTL4RKE13
121VURCDR/DFDR7TUK16
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
FOR FIN: 1000EM1 (ENGINE1)
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUELEC/GCU/12XU1T26
FOR FIN: 1000EM2 (ENGINE2)
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
122VUELEC/GCU/22XU2T27
Subtask 71-51-44-710-051-A ** ON A/C NOT FOR ALL
C. Do tests below:
   (1) Do a test of the IDG - Engine static (
Ref. AMM TASK 24-21-00-710-040).
   (2) Do a test of the IDG - Engine in operation (Ref. AMM TASK 24-21-00-720-041).
   (3) Do a test of the Engine Air Intake Ice Protection (Ref. AMM TASK 30-21-00-710-001).
   (4) Do a test of the EIU (Ref. AMM TASK 73-25-34-710-040).
5. Close-up
Subtask 71-51-44-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-040):
   (3) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (4) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (5) Remove the access platform(s).
   (6) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 12:55:04 UTC