Detailed Inspection of Aft Engine Mount Installation [PW11]
TASK 71-22-41-220-804-A
Detailed Inspection of Aft Engine Mount Installation
1. Reason for the Job
Refer to the MPD TASK: 712221-01
DETAILED INSPECTION OF DISASSEMBLED AFT ENGINE MOUNT INSTALLATION INCLUDING MATING SURFACES
A. Referenced Information
3. Job Set-up
Subtask 71-22-41-010-088-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 71-22-41-210-054-A ** ON A/C NOT FOR ALL
Subtask 71-22-41-410-070-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:33:17 UTC
Detailed Inspection of Aft Engine Mount Installation
1. Reason for the Job
Refer to the MPD TASK: 712221-01
DETAILED INSPECTION OF DISASSEMBLED AFT ENGINE MOUNT INSTALLATION INCLUDING MATING SURFACES
NOTE: In this task the Aft engine mounts are removed from the pylon and from the engine.
2. Job Set-up InformationA. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-22-41-000-805-A | Removal of the Aft Mount Assembly |
| TASK 71-22-41-400-805-A | Installation of the Aft Mount Assembly |
Subtask 71-22-41-010-088-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 71-22-41-210-054-A ** ON A/C NOT FOR ALL
A. Do a detailed visual inspection of the aft engine mount in shop.
5. Close-upNOTE: Inspection is done with engine mount disassembled.
Subtask 71-22-41-410-070-A ** ON A/C NOT FOR ALL