W DOC AIRBUS | AMM A320F

Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ)


TASK 57-27-12-000-002-A
Removal of the Rib 2 Access Panel 540AZ(640AZ) or 540BZ(640BZ)


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BEFORE YOU DO WORK IN OR NEAR A FUEL TANK, MAKE SURE THAT YOU OBEY ALL THE SAFETY PROCEDURES. THIS WILL PREVENT INJURY TO PERSONS AND/OR DAMAGE TO THE AIRCRAFT.
ZONE: 540
ZONE: 640
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
98D27803500001
1
LOCKING TOOL ZERO POS
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
540
FUEL TANK
640
FUEL TANK
540AB, 640AB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 28-10-00-910-001-A
Safety Procedures When You Do Work in a Fuel Tank
TASK 57-27-11-000-001-A
Removal of the Access Panel
3. Job Set-up
Subtask 57-27-12-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Obey the safety procedures when you do work in the fuel tank (Ref. AMM TASK 28-10-00-910-001).
   (2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
   (3) Install the 98D27803500001 LOCKING TOOL ZERO POS on the slats and flaps control lever.
   (4) In the cockpit, on the center pedestal, put the WARNING NOTICE(S) in position to tell persons not to operate the slats and flaps control lever.
Subtask 57-27-12-010-052-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the wing fuel tank, at zone 540(640).
   (2) Remove the applicable access panel (Ref. AMM TASK 57-27-11-000-001):
  • For the left wing: 540AB
  • For the right wing: 640AB.
4. Procedure
Subtask 57-27-12-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the Rib 2 Access Panel 540AZ (640AZ) or 540BZ (640BZ)
   (1) Remove the nuts (2), the washers (3), the bonding leads (7) and the bolts (8).
   (2) Hold the rib 2 access panel (9) and remove the bolts (6), the washers (5) and the clamp disks (4).
   (3) Remove the rib 2 access panel (9).
   (4) Remove and discard the seal (1) from the rib 2 access panel (9).
[Rev.10 from 2021] 2026.04.01 02:12:04 UTC