1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 100 and 70 lbf.in (1.13 and 0.79 m.daN ) T
No specific
Torque wrench: range to between 300 and 270 lbf.in (3.39 and 3.05 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FAB1)
Mineral Oil base Grease-- Vaseline or Petrolatum -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
315AL, 316AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
PACKING
AIPC 49-32-04-50-080
3
PACKING
AIPC 49-32-84-20-080
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
3. Job Set-up
Subtask 49-32-51-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is off.
   (2) Make sure that there is a warning notice in the cockpit to tell persons not to start the APU.
   (3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-00-00-864-001).
   (4) Make sure that the access platform is in position below the APU compartment.
   (5) Make sure that the APU access doors are open (Ref. AMM TASK 52-41-00-010-001).
Subtask 49-32-51-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
4. Procedure
Subtask 49-32-51-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Combustion Chamber Drain Valve.
CAUTION: YOU MUST USE TWO WRENCHES AND HOLD THE COMPONENT WHEN YOU REMOVE/INSTALL THE PIPE COUPLINGS AND/OR UNIONS. THIS PREVENTS DAMAGE TO THE COMPONENT.
   (1) Lubricate the new AIPC 49-32-04-50-080 PACKING (3) or AIPC 49-32-84-20-080 PACKING (3) with Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) .
   (2) Install the new packing (3) on the drain valve (2).
   (3) Install the drain valve (2) in the combustion chamber elbow (4).

NOTE: Make sure that the drain valve is installed with the embossed arrow pointed overboard to the drain tube connector.

   (4) TORQUE the drain valve (2) to between 100 and 70 lbf.in (1.13 and 0.79 m.daN ) T.
   (5) Connect the drain tube (1) to the drain valve (2).
NOTE: When you torque the drain tube nut, hold the drain valve firmly with a wrench to prevent torque transfer.
   (6) TORQUE the drain tube nut (1) to between 300 and 270 lbf.in (3.39 and 3.05 m.daN )
T.
5. Close-up
Subtask 49-32-51-865-052-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 49-32-51-410-050-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Close the APU access doors
315AL 316AR (Ref. AMM TASK 52-41-00-410-001).
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).