W DOC AIRBUS | AMM A320F

Remove, clean and inspect Toilet Rinse Valves from all Toilets


TASK 38-31-55-100-001-A
Remove, clean and inspect Toilet Rinse Valves from all Toilets


NOTE: This task is applicable for A318, A319, A320, A321 with the rinse valve P/N 15800-348 Revision A, B, C installed on Toilet assemblies.
ZONE: 200
1. Reason for the Job
Refer to the MPD TASK: 383155-01
REMOVE, CLEAN AND INSPECT TOILET RINSE VALVES FROM ALL TOILETS.
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 38-31-00-710-009-A
Operational Test of the Toilet Unit
TASK 38-31-55-000-001-A
Removal of the Water Valve
TASK 38-31-55-400-001-A
Installation of the Water Valve
3. Job Set-up
Subtask 38-31-55-010-052-A
A. Removal of the Component
   (1) Remove the water valve (Ref. AMM TASK 38-31-55-000-001).
   (2) Remove the rinse valve screen:
     (a) Remove the water supply line to the water valve.
     (b) Remove the rinse valve screen.
4. Procedure
Subtask 38-31-55-160-050-A
A. Cleaning of the Component (in the workshop)
   (1) Clean and do an inspection of the water valve and the rinse valve screen:
     (a) Send the water valve and the rinse valve screen to the workshop to clean them.
     (b) After the water valve and the rinse valve screen are cleaned:
       1 Do an inspection of the water valve and the rinse valve screen.
       2 Make sure that there is no contamination.
       3 If there is contamination, clean them again.
     (c) If necessary, replace the water valve and the rinse valve screen.
5. Close-up
Subtask 38-31-55-410-051-A
A. Installation of the Component
   (1) Install the rinse valve screen:
     (a) Put the rinse valve screen in its installation position.
     (b) Install the water supply line.
   (2) Install the water valve (Ref. AMM TASK 38-31-55-400-001).
   (3) Flush the toilet and make sure it flushes correctly (Ref. AMM TASK 38-31-00-710-009).
[Rev.10 from 2021] 2026.04.01 01:20:32 UTC