W DOC AIRBUS | AMM A320F

Installation of the Cockpit Protective-Breathing Equipment


TASK 35-31-52-400-002-A
Installation of the Cockpit Protective-Breathing Equipment


WARNING: MAKE SURE THAT YOU OBEY THE MANUFACTURER'S INSTRUCTIONS AND NATIONAL HAZARDOUS MATERIAL REGULATIONS WHEN YOU MOVE OR KEEP THIS EQUIPMENT IN STORAGE:
  • CHEMICAL OXYGEN GENERATORS
  • PROTECTIVE BREATHING EQUIPMENT
  • FIXED AND PORTABLE OXYGEN CYLINDERS.
SPECIAL PRECAUTIONS ARE NECESSARY FOR THIS EQUIPMENT.
ZONE: 210
FIN: 5776HM ** ON A/C NOT FOR ALL
FIN: 5904HM ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 35-00-00-860-001-A
Special Precautions When Working on a Gaseous Oxygen System
F Protective Breathing Equipment ** ON A/C NOT FOR ALL
F Protective Breathing Equipment ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 35-31-52-860-073-A
A. Aircraft Maintenance Configuration
   (1) Obey the special precautions when you do work on a gaseous oxygen system (Ref. AMM TASK 35-00-00-860-001).
   (2) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 35-31-52-420-058-A ** ON A/C NOT FOR ALL
A. Installation of the Protective Breathing Equipment
   (1) Make sure that:
  • You can read the pictogram.
  • You can see the indicator.
  • The tamper seal is not broken.
  • The permitted life is not expired.
   (2) In the cockpit, in the right aft console 702VU, install the protective breathing equipment (1).
Subtask 35-31-52-420-058-D ** ON A/C NOT FOR ALL
A. Installation of the Protective Breathing Equipment.
   (1) Make sure that:
  • You can read the pictogram.
  • You can see the indicator.
  • The tamper seal is not broken.
  • The permitted life is not expired.
   (2) In the cockpit, on the lower part of the rear panel 120VU, install the protective breathing equipment (1).
5. Close-up
Subtask 35-31-52-860-074-A
A. Put the aircraft back to its initial configuration.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.01 01:05:29 UTC