Installation of the Static Probe
TASK 34-11-16-400-002-A
Installation of the Static Probe
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 34-11-16-860-052-A
Subtask 34-11-16-420-051-A ** ON A/C NOT FOR ALL
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install a new AIPC 34-11-01-02-030 PACKING (6).
(4) Carefully engage the static probe (5) on the bolts (7).
(6) Tighten the nuts which are diagonally opposite (X sequence) and TORQUE them to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in )
.
(7) Install a new AIPC 34-11-01-02-060 PACKING (4).
(8) Install the union (2).
(9) TORQUE the union (2) to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft )
.
(10) Remove the blanking plug from the nut (1).
(11) Install the static line (13).
(12) Connect the nut (1).
(13) Install the lugs (9) on the terminals (14) with the bolts (11), the washers (10) and the nuts (8).
Subtask 34-11-16-420-051-B ** ON A/C NOT FOR ALL
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install a new AIPC 34-11-01-02-030 PACKING (6) or AIPC 34-11-81-02-080 PACKING (6).
(4) Carefully engage the static probe (5) on the bolts (7).
(6) Install the four nuts (3).
(7) Tighten the nuts which are diagonally opposite (X sequence) and TORQUE them to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in )
.
(8) Install a new AIPC 34-11-01-02-060 PACKING (4) or AIPC 34-11-81-02-060 PACKING (4).
(9) Install the union (2).
(10) TORQUE the union (2) to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft )
.
(11) Remove the blanking plug from the nut (1).
(12) Install the static line (13).
(13) Connect the nut (1).
(14) Install the lugs (9) on the terminals (14) with the bolts (11), the washers (10) and the nuts (8).
Subtask 34-11-16-865-062-A
Subtask 34-11-16-410-051-A
[Rev.10 from 2021]
2026.04.01 04:01:22 UTC
Installation of the Static Probe
WARNING:
MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
WARNING:
BEFORE YOU OPEN PHC CIRCUIT BREAKERS 2DA1(2,3), OPEN PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE:
- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
CAUTION:
MAKE SURE THAT:
1. Reason for the Job- THERE IS NO SIGN OF CORROSION OR DAMAGE ON THE EQUIPMENT
- THERE IS NO FOREIGN OBJECT IN THE EQUIPMENT
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| FOR [7DA1] (PROBE-L STATIC, 1) | |
| FOR [7DA2] (PROBE-L STATIC, 2) | |
| FOR [8DA1] (PROBE-R STATIC, 1) | |
| FOR [8DA2] (PROBE-R STATIC, 2) | |
| 824 | |
| FOR [7DA3] (PROBE-L STATIC, 3) | |
| FOR [8DA3] (PROBE-R STATIC, 3) | |
| 811 | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 6 | PACKING | AIPC 34-11-01-02-030 |
| 4 | PACKING | AIPC 34-11-01-02-060 |
| 4 | PACKING | AIPC 34-11-81-02-060 |
| 6 | PACKING | AIPC 34-11-81-02-080 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 30-31-00-710-001-A | Operational Test of the Probe Ice Protection |
| TASK 34-11-16-710-001-A | Test of the Static Probe without the CFDS. |
| TASK 34-13-00-790-002-A | Leak Test of the Principal Static and Total Air Data System |
| TASK 34-21-00-790-001-A | Low-Range Leak Test of the Standby Pneumatic Circuits |
| TASK 34-22-25-790-001-A | Low range Leak Test of the Standby Pneumatic circuits |
| FOR [7DA1] (PROBE-L STATIC, 1) | |
| FOR [7DA2] (PROBE-L STATIC, 2) | |
| FOR [8DA1] (PROBE-R STATIC, 1) | |
| FOR [8DA2] (PROBE-R STATIC, 2) | |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 34-11-16-860-052-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the zone 128 for the static probes 7DA1, 8DA1, 7DA2 and 8DA2.
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the zone 120 for the static probes 7DA3 and 8DA3.
(3) Open the access door:
(a) FOR [7DA1] (PROBE-L STATIC, 1), [8DA1] (PROBE-R STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA2] (PROBE-R STATIC, 2)
824
(b) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
811
(4) Make sure that the protective covers of the sensors and probes (AOA, static Pitot and TAT) are removed.
Subtask 34-11-16-865-055-A (1) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the zone 128 for the static probes 7DA1, 8DA1, 7DA2 and 8DA2.
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the zone 120 for the static probes 7DA3 and 8DA3.
(3) Open the access door:
(a) FOR [7DA1] (PROBE-L STATIC, 1), [8DA1] (PROBE-R STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA2] (PROBE-R STATIC, 2)
824
(b) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
811
(4) Make sure that the protective covers of the sensors and probes (AOA, static Pitot and TAT) are removed.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RADAR/1 | 5SQ1 | K13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RADAR/2 | 5SQ2 | K14 |
| ** ON A/C ALL | |||
| FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1) | |||
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1) | |||
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2) | |||
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
Subtask 34-11-16-420-051-A ** ON A/C NOT FOR ALL
WARNING:
IF YOU REPLACE STATIC PROBE 3 (7DA3 OR 8DA3), OR IF YOU REPLACE MORE THAN ONE STATIC PROBE, YOU MUST DO A LEAK TEST ON THE RELATED CIRCUITS.
A. Installation of the Static Probe NOTE: This procedure is the same for the six static probes.
(1) Clean the component interfaces and the adjacent area.(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install a new AIPC 34-11-01-02-030 PACKING (6).
(4) Carefully engage the static probe (5) on the bolts (7).
NOTE: The heating element wires must point as follows:
(5) Install the four nuts (3). - For static probes 7DA1, 8DA1, 7DA2, to the nose of the aircraft
- For static probe 8DA2, to the tail of the A/C
- For static probes 7DA3 and 8DA3, down.
(6) Tighten the nuts which are diagonally opposite (X sequence) and TORQUE them to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in )
. (7) Install a new AIPC 34-11-01-02-060 PACKING (4).
(8) Install the union (2).
(9) TORQUE the union (2) to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft )
. (10) Remove the blanking plug from the nut (1).
(11) Install the static line (13).
(12) Connect the nut (1).
(13) Install the lugs (9) on the terminals (14) with the bolts (11), the washers (10) and the nuts (8).
NOTE: The covers (12) of the static probe (8DA2) must not touch the static line. Thus, make sure that the lugs (9) connected to the terminals (14) are correctly installed as shown in the figure given in this procedure.
(14) Install the covers (12). WARNING:
IF YOU REPLACE STATIC PROBE 3 (7DA3 OR 8DA3), OR IF YOU REPLACE MORE THAN ONE STATIC PROBE, YOU MUST DO A LEAK TEST ON THE RELATED CIRCUITS.
A. Installation of the Static Probe NOTE: This procedure is the same for the six static probes.
(1) Clean the component interfaces and the adjacent area.(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install a new AIPC 34-11-01-02-030 PACKING (6) or AIPC 34-11-81-02-080 PACKING (6).
(4) Carefully engage the static probe (5) on the bolts (7).
NOTE: The heating element wires must point as follows:
(5) Install the bonding strip (15) (Ref. AMM TASK 20-28-00-912-802). - For static probes 7DA1, 8DA1, 7DA2, to the nose of the aircraft
- For static probe 8DA2, to the tail of the A/C
- For static probes 7DA3 and 8DA3, down.
(6) Install the four nuts (3).
(7) Tighten the nuts which are diagonally opposite (X sequence) and TORQUE them to between 0.15 and 0.13 m.daN (13.27 and 11.50 lbf.in )
. (8) Install a new AIPC 34-11-01-02-060 PACKING (4) or AIPC 34-11-81-02-060 PACKING (4).
(9) Install the union (2).
(10) TORQUE the union (2) to between 1.87 and 1.76 m.daN (13.79 and 12.98 lbf.ft )
. (11) Remove the blanking plug from the nut (1).
(12) Install the static line (13).
(13) Connect the nut (1).
(14) Install the lugs (9) on the terminals (14) with the bolts (11), the washers (10) and the nuts (8).
NOTE: The covers (12) of the static probe (8DA2) must not touch the static line. Thus, make sure that the lugs (9) connected to the terminals (14) are correctly installed as shown in the figure given in this procedure.
(15) Install the covers (12). B. Table of the circuit breakers used in this procedure:
Subtask 34-11-16-942-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
C. Safety Precautions
(1) In the cockpit, on overhead control and indicating panel 25VU:
(a) Make sure that the PROBE/WINDOW HEAT pushbutton switch is released (the ON legend is off).
(b) Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 34-11-16-865-056-A (1) In the cockpit, on overhead control and indicating panel 25VU:
(a) Make sure that the PROBE/WINDOW HEAT pushbutton switch is released (the ON legend is off).
(b) Make sure that this(these) circuit breaker(s) is(are) closed:
- 2KS1
- 2KS2.
D. Remove the safety clips and tags and close these circuit breakers in this sequence:
Subtask 34-11-16-790-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RADAR/1 | 5SQ1 | K13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/RADAR/2 | 5SQ2 | K14 |
| ** ON A/C ALL | |||
| FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1) | |||
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2) | |||
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
| FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1) | |||
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
E. Leak Test
Subtask 34-11-16-790-051-B ** ON A/C NOT FOR ALL NOTE: The leak test is mandatory if you installed one static probe 3 (7DA3 or 8DA3) or more than two static probes.
(1) Do a leak test of the main static system (Ref. AMM TASK 34-13-00-790-002) if you installed: - more than two static probes, and
- a minimum of one of them is a main static probe (7DA1, 7DA2, 8DA1 or 8DA2).
E. Leak Test
Subtask 34-11-16-710-052-A NOTE: The leak test is mandatory if you installed one static probe 3 (7DA3 or 8DA3) or more than two static probes.
(1) Do a leak test of the main static system (Ref. AMM TASK 34-13-00-790-002) if you installed:- more than two static probes, and
- a minimum of one of them is a main static probe (7DA1, 7DA2, 8DA1 or 8DA2).
F. Do an operational test of the Static Probe with the CFDS:
Do the operational test of the Probe Ice Protection
(Ref. AMM TASK 30-31-00-710-001).
5. Close-upDo the operational test of the Probe Ice Protection
(Ref. AMM TASK 30-31-00-710-001).
NOTE: As an alternative procedure, you can do this operational test without the CFDS
(Ref. AMM TASK 34-11-16-710-001).
(Ref. AMM TASK 34-11-16-710-001).
Subtask 34-11-16-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door :
(a) FOR [7DA1] (PROBE-L STATIC, 1), [8DA1] (PROBE-R STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA2] (PROBE-R STATIC, 2)
824 (Ref. AMM TASK 52-41-00-410-002).
(b) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
811
(3) Install the protective covers on the sensors and probes (AOA, static, Pitot and TAT).
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door :
(a) FOR [7DA1] (PROBE-L STATIC, 1), [8DA1] (PROBE-R STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA2] (PROBE-R STATIC, 2)
824 (Ref. AMM TASK 52-41-00-410-002).
(b) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
811
(3) Install the protective covers on the sensors and probes (AOA, static, Pitot and TAT).
(4) Remove the access platform(s).