W DOC AIRBUS | AMM A320F

Inspection of the Static Port and Standby Static Port


TASK 34-11-16-200-001-A
Inspection of the Static Port and Standby Static Port


WARNING: MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
WARNING: MAKE SURE THAT:
  • THE STATIC PROBE IS NOT HOT
  • THE ELECTRICAL SUPPLY TO THE HEATING ELEMENT OF THE PROBE IS ISOLATED
BEFORE YOU START THE TASK.
ZONE: 120
FIN: 7DA1
FIN: 7DA2
FIN: 7DA3
FIN: 8DA1
FIN: 8DA2
FIN: 8DA3
1. Reason for the Job
To do a visual inspection of the static port and standby static port.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
FOR [7DA1] (PROBE-L STATIC, 1)
FOR [7DA2] (PROBE-L STATIC, 2)
FOR [8DA1] (PROBE-R STATIC, 1)
FOR [8DA2] (PROBE-R STATIC, 2)
No specific
AR
ACCESS PLATFORM 1M(3 FT)
FOR [7DA3] (PROBE-L STATIC, 3)
FOR [8DA3] (PROBE-R STATIC, 3)
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
FOR [7DA1] (PROBE-L STATIC, 1)
FOR [7DA2] (PROBE-L STATIC, 2)
FOR [8DA1] (PROBE-R STATIC, 1)
FOR [8DA2] (PROBE-R STATIC, 2)
TASK 34-10-00-170-002-A
Flushing of the Principal Static Pressure Lines
SRM 530011
SRM 531111
FOR [7DA3] (PROBE-L STATIC, 3)
FOR [8DA3] (PROBE-R STATIC, 3)
TASK 34-10-00-170-003-A
Draining and Flushing of Standby Pneumatic Circuits
TASK 34-22-25-170-001-A
Draining and Flushing of Standby Pneumatic Circuits
TASK 53-19-42-000-001-A
Removal of the Static Port Blanking-Plate
TASK 53-19-42-400-001-A
Installation of the Static Port Blanking-Plate
SRM 530011
SRM 531111
3. Job Set-up
Subtask 34-11-16-865-059-A
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1)
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2)
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3)
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
Subtask 34-11-16-010-051-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) FOR [7DA1] (PROBE-L STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA1] (PROBE-R STATIC, 1), [8DA2] (PROBE-R STATIC, 2)
  • Put an ACCESS PLATFORM 1M(3 FT) in position at the zone 128.
   (2) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
  • Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the zone 120.
Subtask 34-11-16-010-051-B ** ON A/C NOT FOR ALL
B. Get Access
   (1) FOR [7DA1] (PROBE-L STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA1] (PROBE-R STATIC, 1), [8DA2] (PROBE-R STATIC, 2)
  • Put an ACCESS PLATFORM 1M(3 FT) in position at the zone 128.
   (2) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
  • Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the zone 120.
4. Procedure
Subtask 34-11-16-220-050-A ** ON A/C NOT FOR ALL
A. Inspection of the Static Ports
   (1) Remove the cover of the static probes.
   (2) FOR [7DA1] (PROBE-L STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA1] (PROBE-R STATIC, 1), [8DA2] (PROBE-R STATIC, 2)
     (a) Do a visual check of the principal static ports:
  • If there is contamination, do the flushing of the principal static pressure-lines (Ref. AMM TASK 34-10-00-170-002).
  • If there are signs of lightning strikes (burn marks, spots, etc.) on one of the static ports, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011 or if the repair is not given in the Structural Repair Manual (SRM), contact the Airbus Customer Services department.
     (b) Do a visual check of the structure around the principal static ports:
  • If there is damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011, do the repair given in the procedure SRM 531111.
   (3) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
     (a) Do a visual check of the standby static ports:
  • If there is contamination, do the draining and the flushing of the standby static pressure-lines (Ref. AMM TASK 34-10-00-170-003).
  • If there is a damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011 or if the repair is not given in the SRM, contact the Airbus Customer Services department.
     (b) Do a visual check of the structure around the standby static ports:
  • If there is damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011, do the repair given in the procedure SRM 531111.
Subtask 34-11-16-220-050-B ** ON A/C NOT FOR ALL
A. Inspection of the Static Ports
   (1) Remove the cover of the static probes.
   (2) FOR [7DA1] (PROBE-L STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA1] (PROBE-R STATIC, 1), [8DA2] (PROBE-R STATIC, 2)
     (a) Do a visual check of the principal static ports:
  • If there is contamination, do the flushing of the principal static pressure-lines (Ref. AMM TASK 34-10-00-170-002).
  • If there are signs of lightning strikes (burn marks, spots, etc.) on one of the static ports, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011 or if the repair is not given in the Structural Repair Manual (SRM), contact the Airbus Customer Services department.
     (b) Do a visual check of the structure around the principal static ports:
  • If there is damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011, do the repair given in the procedure SRM 531111.
   (3) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
     (a) Do a visual check of the standby static ports:
  • If there is contamination, do the draining and the flushing of the standby static pressure-lines (Ref. AMM TASK 34-10-00-170-003).
  • If there is a damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011 or if the repair is not given in the Structural Repair Manual (SRM), contact the Airbus Customer Services department.
     (b) Do a visual check of the structure and the blanking plate around the standby static ports.
       1 If there is a damage or if the surface of the blanking plate of the standby static port is not smooth, refer to the procedure SRM 530011 for the allowable damage criteria.
         a If the signs of damage are out of the tolerances given in the procedure SRM 530011:
Subtask 34-11-16-220-050-D ** ON A/C NOT FOR ALL
A. Inspection of the Static Ports
   (1) Remove the cover of the static probes.
   (2) FOR [7DA1] (PROBE-L STATIC, 1), [7DA2] (PROBE-L STATIC, 2), [8DA1] (PROBE-R STATIC, 1), [8DA2] (PROBE-R STATIC, 2)
     (a) Do a visual check of the principal static ports:
  • If there is contamination, do the flushing of the principal static pressure-lines (Ref. AMM TASK 34-10-00-170-002).
  • If there are signs of lightning strikes (burn marks, spots, etc.) on one of the static ports, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011 or if the repair is not given in the Structural Repair Manual (SRM), contact the Airbus Customer Services department.
     (b) Do a visual check of the structure around the principal static ports:
  • If there is damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011, do the repair given in the procedure SRM 531111.
   (3) FOR [7DA3] (PROBE-L STATIC, 3), [8DA3] (PROBE-R STATIC, 3)
     (a) Do a visual check of the standby static ports:
  • If there is contamination, do the draining and the flushing of the standby static pressure-lines (Integrated Standby Instrument System (ISIS)) (Ref. AMM TASK 34-22-25-170-001).
  • If there is a damage, refer to the procedure SRM 530011 for the allowable damage criteria.
  • If the signs of damage are out of the tolerances given in the procedure SRM 530011 or if the repair is not given in the SRM, contact the Airbus Customer Services department.
     (b) Do a visual inspection of the structure and the blanking plate around the standby static ports.
       1 If there is damage or if the surface of the blanking plate of the standby static port is not smooth, refer to the procedure SRM 530011 for the allowable damage criteria.
         a If the signs of damage are out of the tolerances given in the procedure SRM 530011:
5. Close-up
Subtask 34-11-16-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the cover of the static probes.
   (3) Remove the access platform(s).
Subtask 34-11-16-410-053-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the cover of the static probes.
   (3) Remove the access platform(s).
Subtask 34-11-16-865-060-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 8DA1 (PROBER STATIC, 1) FOR FIN: 7DA1 (PROBEL STATIC, 1)
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
FOR FIN: 8DA2 (PROBER STATIC, 2) FOR FIN: 7DA2 (PROBEL STATIC, 2)
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
FOR FIN: 8DA3 (PROBER STATIC, 3) FOR FIN: 7DA3 (PROBEL STATIC, 3)
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
[Rev.10 from 2021] 2026.04.01 04:08:04 UTC