W DOC AIRBUS | AMM A320F

Removal of the Static Port Blanking-Plate


TASK 53-19-42-000-001-A
Removal of the Static Port Blanking-Plate


WARNING: BEFORE YOU OPEN PHC CIRCUIT BREAKERS 2DA1(2,3), OPEN PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE: - THE PROBES WILL BECOME TOO HOT. - THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
WARNING: MAKE SURE THAT THE CIRCUIT BREAKERS RELATED TO THE WEATHER RADAR ARE OPENED, SAFETIED AND TAGGED.
WARNING: MAKE SURE THAT:
  • THE STATIC PROBE IS NOT HOT
  • THE ELECTRICAL SUPPLY TO THE HEATING ELEMENT OF THE PROBE IS ISOLATED
BEFORE YOU START THE TASK.
ZONE: 120
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
SCRAPER - NON METALLIC
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
120
AVIONICS COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
3. Job Set-up
Subtask 53-19-42-865-050-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PHC/12DA1D03
49VUANTI ICE/PROBES/PITOT/13DA1D02
122VUANTI ICE/PROBES/PHC/32DA3Y16
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/PHC/22DA2Y12
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
122VUANTI ICE/PROBES/1/TAT1DA1Z12
Subtask 53-19-42-941-050-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone 120.
Subtask 53-19-42-860-051-A ** ON A/C NOT FOR ALL
C. Aircraft Maintenance Configuration
   (1) Remove the protective covers from the static probes.
4. Procedure
Subtask 53-19-42-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Static Port Blanking-Plate
   (1) Use the SCRAPER - NON METALLIC to remove the sealants from the area between the static port blanking-plate (3) and the fuselage structure.
   (2) Remove the screws (1) and (2).
   (3) Remove the static port blanking-plate (3).
[Rev.10 from 2021] 2026.04.01 01:52:15 UTC