Removal of the Power Supply Unit - Sharklet
TASK 33-48-38-000-802-A
Removal of the Power Supply Unit - Sharklet
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 33-48-38-941-054-A ** ON A/C NOT FOR ALL
Subtask 33-48-38-020-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:52:53 UTC
Removal of the Power Supply Unit - Sharklet
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 4M (13 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | SCRAPER - NON METALLIC |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 534 | WING TIP |
| 634 | WING TIP |
| FOR [14LV] (PSU) | |
| 634CB | |
| FOR [15LV] (PSU) | |
| 534CB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 33-48-38-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
(2) Put a WARNING NOTICE(S) in position on panel 25VU to tell persons not to operate the strobe lights or the navigation lights.
Subtask 33-48-38-865-055-A ** ON A/C NOT FOR ALL (1) Put the SAFETY BARRIER(S) in position.
(2) Put a WARNING NOTICE(S) in position on panel 25VU to tell persons not to operate the strobe lights or the navigation lights.
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 33-48-38-860-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/EXT LT/NAV2/AND LOGO/LT | 2LA | T02 |
| 122VU | LIGHTING/WING/STROBE | 10LV | V05 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHT/EXT LT NAV1/AND LOGO/LT | 1LA | T03 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/EXT LT/NAV1/AND LOGO/LT | 1LA | T03 |
C. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
Subtask 33-48-38-010-051-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
D. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the zone 534(634).
(2) Remove the access panel (1):
(a) FOR [15LV] (PSU)
(d) Hold the access panel (1) and remove the screws (2). Identify the positions of each screw (2) with a label for the subsequent installation procedure. Each screw (2) can be a different length.
(e) Remove the access panel (1).
4. Procedure(1) Put the ACCESS PLATFORM 4M (13 FT) in position below the zone 534(634).
(2) Remove the access panel (1):
(a) FOR [15LV] (PSU)
- Remove 534CB.
- Remove 634CB.
(d) Hold the access panel (1) and remove the screws (2). Identify the positions of each screw (2) with a label for the subsequent installation procedure. Each screw (2) can be a different length.
(e) Remove the access panel (1).
Subtask 33-48-38-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Power Supply Unit
(2) Disconnect the electrical connectors (1) from the power supply unit (2).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Use a SCRAPER - NON METALLIC to remove the sealant from the bolts (4) and (6) and the washers (3) and (5).
(5) Remove the bolts (4) and (6) and the washers (3) and (5).
(6) Carefully remove the power supply unit (2).
WARNING:
DO NOT DISCONNECT THE ELECTRICAL CONNECTIONS FOR AT LEAST 2 MINUTES AFTER YOU DE-ENERGIZE THE ELECTRICAL CIRCUITS.
(1) Identify the electrical connectors (1) and the electrical connectors of the power supply unit (2) with a label. This is for the subsequent installation procedure. (2) Disconnect the electrical connectors (1) from the power supply unit (2).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Use a SCRAPER - NON METALLIC to remove the sealant from the bolts (4) and (6) and the washers (3) and (5).
(5) Remove the bolts (4) and (6) and the washers (3) and (5).
(6) Carefully remove the power supply unit (2).
Strobe Light PSU - Sharklet - Access