Reactivation of the Brake Temperature Monitoring-Unit
TASK 32-47-00-440-002-A
Reactivation of the Brake Temperature Monitoring-Unit
1. Reason for the Job
MMEL 32-47-01
BRAKE TEMPERATURE MONITORING UNIT (FAA ONLY)
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 32-47-00-861-051-A
Subtask 32-47-00-440-051-A
Subtask 32-47-00-410-051-A
[Rev.10 from 2021]
2026.04.01 00:50:18 UTC
Reactivation of the Brake Temperature Monitoring-Unit
1. Reason for the Job
MMEL 32-47-01
BRAKE TEMPERATURE MONITORING UNIT (FAA ONLY)
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 32-47-00-710-001-A | Operational Test of the Brake Temperature System |
Subtask 32-47-00-861-051-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 32-47-00-865-060-A (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
B. Table of the circuit breakers used in this procedure:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/BRK/TEMP/DET/UNIT | 1GW | M37 |
Subtask 32-47-00-440-051-A
A. Reactivation of the Brake Temperature Monitoring-Unit
(1) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-47-00-710-051-A (1) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
- 1GW.
B. Operational Test
(1) Do an operational test of the brake temperature system (Ref. AMM TASK 32-47-00-710-001).
5. Close-up(1) Do an operational test of the brake temperature system (Ref. AMM TASK 32-47-00-710-001).
Subtask 32-47-00-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 32-47-00-860-055-A (1) Make sure that the work area is clean and clear of tools and other items.
B. Put the aircraft back to its initial configuration.
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).