Installation of the MLG Tachometer-Drive
TASK 32-42-68-400-003-A
Installation of the MLG Tachometer-Drive
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 32-42-68-941-051-A
Subtask 32-42-68-420-050-A
Subtask 32-42-68-942-050-A
[Rev.10 from 2021]
2026.04.01 12:31:32 UTC
Installation of the MLG Tachometer-Drive
WARNING:
MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 2678GM ** ON A/C NOT FOR ALL
FIN: 2679GM ** ON A/C NOT FOR ALL
FIN: 2680GM ** ON A/C NOT FOR ALL
FIN: 2681GM ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 2679GM ** ON A/C NOT FOR ALL
FIN: 2680GM ** ON A/C NOT FOR ALL
FIN: 2681GM ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| No specific | 1 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-42-57-400-001-A | Installation of the Tachometer |
Subtask 32-42-68-941-051-A
A. Safety Precautions
(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On the panel 400VU:
4. Procedure(1) Make sure that the SAFETY BARRIER(S) are in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On the panel 400VU:
- make sure that the landing-gear control-lever 6GA is in the DOWN position
- make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the landing gear.
Subtask 32-42-68-420-050-A
A. Installation of the MLG Tachometer-Drive
(1) Install the applicable tachometer (Ref. AMM TASK 32-42-57-400-001):
(a) FOR [2678GM] (DRIVE ASSY-TACHOMETER,WHEEL 4)
install 22GG.
(b) FOR [2679GM] (DRIVE ASSY-TACHOMETER,WHEEL 3)
install 20GG.
(c) FOR [2680GM] (DRIVE ASSY-TACHOMETER,WHEEL 2)
install 21GG.
(d) FOR [2681GM] (DRIVE ASSY-TACHOMETER,WHEEL 1)
install 19GG.
5. Close-up(1) Install the applicable tachometer (Ref. AMM TASK 32-42-57-400-001):
(a) FOR [2678GM] (DRIVE ASSY-TACHOMETER,WHEEL 4)
install 22GG.
(b) FOR [2679GM] (DRIVE ASSY-TACHOMETER,WHEEL 3)
install 20GG.
(c) FOR [2680GM] (DRIVE ASSY-TACHOMETER,WHEEL 2)
install 21GG.
(d) FOR [2681GM] (DRIVE ASSY-TACHOMETER,WHEEL 1)
install 19GG.
NOTE: When you install the tachometers you will install the tachometer drives.
Subtask 32-42-68-942-050-A
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIER(S).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIER(S).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.