Installation of the Normal-Brake Supply Pressure-Transducer


TASK 32-42-22-400-001-A
Installation of the Normal-Brake Supply Pressure-Transducer


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 140
FIN: 96GG ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
CONTAINER 3 L(3/4 USGAL)
No specific
Torque wrench: range to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.04QAB2)
Coating_- Flexible Structure
(Material No.06AAA1)
Polysulfide Sealant_General Purpose Brushable -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
140
CENTER WING
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
11
PACKING
AIPC 32-42-22-01-010
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-42-00-710-001-A
Operational Check of the Normal Braking System
TASK 32-42-00-870-001-A
Bleeding of the Normal Braking at the Brake Units
3. Job Set-up
Subtask 32-42-22-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
   (3) Make sure that the reservoir of the Green hydraulic system is depressurized
   (4) Make sure that a WARNING NOTICE(S) is in position to tell persons not to pressurize the Green hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel
  • on the ground service panel of the Green hydraulic system.
   (5) Make sure that one door of the main gear is open (Ref. AMM TASK 32-12-00-010-001).
   (6) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position.
   (7) Make sure that the CONTAINER 3 L(3/4 USGAL) is in position below the location of the pressure transducer (10).
Subtask 32-42-22-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUABCU &/Y BRK/PRESS IND61GGC10
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUABCU/HOT BUS/SPLY110GGP30
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
** ON A/C NOT FOR ALL
121VUABCU/HOT BUS/SPLY110GGP31
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
4. Procedure
Subtask 32-42-22-210-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Lubricate the new AIPC 32-42-22-01-010 PACKING (11) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
   (5) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the bolts (3).
Subtask 32-42-22-420-050-A ** ON A/C NOT FOR ALL
B. Installation of the Pressure Transducer (96GG)
   (1) Remove the blanking caps from the ports of the manifold (1) and the pressure transducer (10).
   (2) Install the new packing (11) on the pressure transducer (10).
   (3) Hold the pressure transducer (10) in position on the manifold (1) and install the bolts (3) and the washers (2).
   (4) TORQUE the bolts (3) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T.
   (5) Install the clamp (7) on the pressure transducer (10).
   (6) Install the bonding strap (6) with the washer (5), the bolt (4) and the nut (8) at the clamp (7) (
Ref. AMM TASK 20-28-00-912-802).
   (7) Remove the blanking cap from the electrical connector (9).
   (8) Make sure that all the electrical connections are clean and in the correct condition.
   (9) Connect the electrical connector (9) to the pressure transmitter (10).
   (10) Seal the connections of the bonding strap (6) with Polysulfide Sealant_General Purpose Brushable - (Material No.06AAA1) .
   (11) Apply Coating_- Flexible Structure (Material No.04QAB2) to the sealant.
Subtask 32-42-22-865-052-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUABCU &/Y BRK/PRESS IND61GGC10
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUABCU/HOT BUS/SPLY110GGP30
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
** ON A/C NOT FOR ALL
121VUABCU/HOT BUS/SPLY110GGP31
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-42-22-710-050-A ** ON A/C NOT FOR ALL
D. Test
   (1) Bleed the normal brake system (Ref. AMM TASK 32-42-00-870-001).
   (2) Do an operational check of the normal brake system (Ref. AMM TASK 32-42-00-710-001).
   (3) Examine the pressure transducer and the component interface for leaks. Leaks are not permitted.
5. Close-up
Subtask 32-42-22-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.