Removal of the Normal-Brake Supply Pressure-Transducer
TASK 32-42-22-000-001-A
Removal of the Normal-Brake Supply Pressure-Transducer
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 32-42-22-010-050-A ** ON A/C NOT FOR ALL
Subtask 32-42-22-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:47:55 UTC
Removal of the Normal-Brake Supply Pressure-Transducer
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | 1 | CONTAINER 3 L(3/4 USGAL) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 2 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 140 | CENTER WING |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 32-42-22-010-050-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Open the left or the right MLG door (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position.
Subtask 32-42-22-860-050-A ** ON A/C NOT FOR ALL (1) Open the left or the right MLG door (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) in position.
B. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized
(Ref. AMM TASK 29-10-00-864-001).
(2) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(3) Put a WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
Subtask 32-42-22-865-050-A ** ON A/C NOT FOR ALL (1) Make sure that the Green hydraulic system is depressurized
(Ref. AMM TASK 29-10-00-864-001).
(2) Depressurize the reservoir of the Green hydraulic system
(Ref. AMM TASK 29-14-00-614-001).
(3) Put a WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- on the panel 40VU in the cockpit
- on the ground service panel of the Green hydraulic system.
C. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ABCU &/Y BRK/PRESS IND | 61GG | C10 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ABCU/HOT BUS/SPLY | 110GG | P30 |
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ABCU/HOT BUS/SPLY | 110GG | P31 |
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
Subtask 32-42-22-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Pressure Transducer (96GG)
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Disconnect the electrical connector (9).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove the nut (8), the bolt (4), the washer (5) and the bonding strap (6) from the clamp (7).
(5) Remove the clamp (7) from the pressure transducer (10).
(6) Hold the pressure transducer (10) and remove the bolts (3) and the washers (2).
(7) Remove the pressure transducer (10) from the manifold (1).
(8) Remove and discard the packing (11).
(9) Install the CAP - BLANKING in the open ports of the pressure transducer (10) and the manifold (1).
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Disconnect the electrical connector (9).
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(4) Remove the nut (8), the bolt (4), the washer (5) and the bonding strap (6) from the clamp (7).
(5) Remove the clamp (7) from the pressure transducer (10).
(6) Hold the pressure transducer (10) and remove the bolts (3) and the washers (2).
(7) Remove the pressure transducer (10) from the manifold (1).
(8) Remove and discard the packing (11).
(9) Install the CAP - BLANKING in the open ports of the pressure transducer (10) and the manifold (1).
Normal-Brake Supply Pressure-Transducer