Reactivation of the Hydraulic Reservoir Quantity-Indicator
TASK 29-31-00-440-003-A
Reactivation of the Hydraulic Reservoir Quantity-Indicator
MMEL 29-20-41A
HYDRAULIC RESERVOIR QUANTITY INDICATOR (GREEN SERVISING PANEL) (FAA ONLY)
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 29-31-00-941-051-A
Subtask 29-31-00-960-050-A
Subtask 29-31-00-942-058-A
[Rev.10 from 2021]
2026.04.01 00:27:29 UTC
Reactivation of the Hydraulic Reservoir Quantity-Indicator
FIN: 1834GQ
1. Reason for the JobMMEL 29-20-41A
HYDRAULIC RESERVOIR QUANTITY INDICATOR (GREEN SERVISING PANEL) (FAA ONLY)
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-31-21-000-001-A | Removal of the Quantity Indicator |
| TASK 29-31-21-400-001-A | Installation of the Quantity Indicator |
Subtask 29-31-00-941-051-A
A. There is no special job set-up for this task.
4. ProcedureSubtask 29-31-00-960-050-A
A. Reactivation of the Hydraulic Reservoir Quantity-Indicator (1834GQ) (referred to as the quantity indicator)
(1) Do the troubleshooting of the quantity indicator.
(a) If necessary, replace the quantity indicator (Ref. AMM TASK 29-31-21-000-001) and (Ref. AMM TASK 29-31-21-400-001).
5. Close-up(1) Do the troubleshooting of the quantity indicator.
(a) If necessary, replace the quantity indicator (Ref. AMM TASK 29-31-21-000-001) and (Ref. AMM TASK 29-31-21-400-001).
Subtask 29-31-00-942-058-A
A. Put the aircraft back to the serviceable condition.
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Remove the entry from the log book.
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Remove the entry from the log book.