Removal of the Quantity Indicator
TASK 29-31-21-000-001-A
Removal of the Quantity Indicator
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-31-21-865-050-A
Subtask 29-31-21-020-050-A
[Rev.10 from 2021]
2026.04.01 08:13:56 UTC
Removal of the Quantity Indicator
FIN: 1834GQ
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197CB |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 29-31-21-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-31-21-010-050-A 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/HYD/QTY/IND | 1831GQ | P35 |
Subtask 29-31-21-020-050-A
A. Removal of the Quantity Indicator
(1) Loosen the screws (1).
(2) Pull the quantity indicator (2) out of the ground service panel (3) of the Green hydraulic system.
(3) Remove the electrical connector (4) from the quantity indicator (2).
(4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(1) Loosen the screws (1).
(2) Pull the quantity indicator (2) out of the ground service panel (3) of the Green hydraulic system.
(3) Remove the electrical connector (4) from the quantity indicator (2).
(4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
Quantity Indicator