W DOC AIRBUS | AMM A320F

Installation of the Hoisting Sling


TASK 27-80-00-400-001-A
Installation of the Hoisting Sling


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
98D27803000000
1
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
98D27804009001
1
SLATS - SLING
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 27-80-00-866-004-A
Extending the Slats on the Ground
3. Job Set-up
Subtask 27-80-00-941-056-A
A. Safety Precautions
   (1) Put a WARNING NOTICE(S) in position to tell persons not to operate the slat controls.
   (2) Put the SAFETY BARRIER(S) in position.
Subtask 27-80-00-860-051-A
B. Aircraft Maintenance Configuration
   (1) Make sure that the slats are fully extended (Ref. AMM TASK 27-80-00-866-004).
   (2) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is installed on the slat/flap control lever on the panel 114VU.
4. Procedure
Subtask 27-80-00-480-050-B
A. Installation of the Hoisting Sling
   (1) Remove and discard the patch (8) from the hoisting points.
   (2) Remove the blanking caps from the slat.
   (3) Remove the pip-pins (4) and the lifting lugs (5) from the hoisting sling.
   (4) Install the lifting lugs (5) in the slat.
   (5) Attach the 98D27804009001 SLATS - SLING to a hoist with a capacity of 41kg (90lb).
   (6) Use the hoist to position the sling over the slat.
   (7) Make sure that the clevis (6) is in the correct position to attach to the lifting lugs (5).
   (8) Lower the hoisting sling until it can be attached to the lifting lugs (5).
   (9) Connect the clevis (6) to the lifting lugs (5) with the pip-pins (4).
   (10) Put the trailing edge block (7) in position on the trailing edge of the slat.
   (11) If necessary, loosen the nut (2) and adjust the turnbuckle (1) to get the correct angle to do the lift.
5. Close-up
Subtask 27-80-00-942-055-A
A. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the safety barriers.
   (3) Remove the WARNING NOTICE(S).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.03.31 23:56:13 UTC