W DOC AIRBUS | AMM A320F

Installation of the Command Sensor Unit (CSU)


TASK 27-51-17-400-001-A
Installation of the Command Sensor Unit (CSU)


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
ZONE: 210
FIN: 51CV
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
No specific
corrosion-resistant steel lockwire 0.5 mm (0.020 in.) dia.
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 27-50-00-866-009-A
Retraction of the Flaps on the Ground
TASK 27-50-00-866-009-A-01
Retraction of the Flaps/Slats on the Ground
TASK 27-54-00-710-002-A
Operational Test of the Flap and Slat Systems
TASK 31-21-00-750-002-A
Procedure to Set the Clock
TASK 31-35-22-000-001-A
Removal of the Printer
TASK 31-35-22-400-001-A
Installation of the Printer
F Command Sensor Unit (CSU) ** ON A/C NOT FOR ALL
F Command Sensor Unit (CSU) ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 27-51-17-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the flaps and slats are in the fully retracted position (Ref. AMM TASK 27-50-00-866-009).
   (2) Make sure that the hydraulic systems are depressurized.
   (3) Make sure that the printer is removed (Ref. AMM TASK 31-35-22-000-001).
Subtask 27-51-17-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT FLP/POS/IND 11CNB12
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT FLP/POS/IND 11CNB07
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C ALL
105VUELEC/HOT BUS/702PP SPLY5PB2D02
105VUELEC/HOT BUS/701PP SPLY5PB1D01
105VUELEC/HOT BUS/702PP SPLY12PB2E02
105VUELEC/HOT BUS/701PP SPLY12PB1E01
** ON A/C NOT FOR ALL
121VUFLIGHT CONTROLS/SLT FLP/2POS/IND2CNP16
** ON A/C ALL
121VUFLIGHT CONTROLS/FLP/CTL AND/MONG/SYS28CVQ21
121VUFLIGHT CONTROLS/SLT/CTL/SYS27CVR21
** ON A/C NOT FOR ALL
121VUFLIGHT CONTROLS/SLT FLP/2POS/IND2CNP21
** ON A/C ALL
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
4. Procedure
Subtask 27-51-17-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Command Sensor Unit (CSU)
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install the control lever (9) on the CSU (5).
     (a) Make sure that the mark on the gear of the CSU (5) aligns with the fixed mark. Correctly engage the gear in the control lever (9).
   (4) Install the washers (4) and the screws (3), and tighten them.
   (5) Safety the screws with lockwire:
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
     (a) Safety the screws (3) with corrosion-resistant steel lockwire 0.5 mm (0.020 in.) dia..
   (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (7) Make sure that all the electrical connections are clean and in the correct condition.
   (8) Connect the electrical connectors (7) and (6) to the CSU (5).
   (9) Connect the electrical connector (8) to the control lever (9).
   (10) Install the control lever (9) on its support.
   (11) Install the washers (2) and the screws (1), and tighten them.
Subtask 27-51-17-420-050-B ** ON A/C NOT FOR ALL
A. Installation of the CSU
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Install the control lever (9) on the CSU (5).
     (a) Make sure that the mark on the gear of the CSU (5) aligns with the fixed mark. Correctly engage the gear in the control lever (9).
   (4) Install the washers (4) and the screws (3), (10), and tighten them.
   (5) Safety the screws with lockwire:
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
     (a) Safety the screws (3),(10) with corrosion-resistant steel lockwire 0.5 mm (0.020 in.) dia..
   (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (7) Make sure that all the electrical connections are clean and in the correct condition.
   (8) Connect the electrical connectors (7) and (6) to the CSU (5).
   (9) Connect the electrical connector (8) to the control lever (9).
   (10) Install the control lever (9) on its support.
   (11) Install the washers (2) and the screws (1), and tighten them.
Subtask 27-51-17-210-051-A
B. Visual Inspection of the Electrical Harnesses
   (1) Make sure that the electrical harnesses of the CSU do not touch FLAPS control panel 114VU.
Subtask 27-51-17-420-052-A
C. Installation of the Printer
   (1) Install the printer (Ref. AMM TASK 31-35-22-400-001).
Subtask 27-51-17-865-052-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT FLP/POS/IND 11CNB12
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT FLP/POS/IND 11CNB07
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C ALL
105VUELEC/HOT BUS/702PP SPLY5PB2D02
105VUELEC/HOT BUS/701PP SPLY5PB1D01
105VUELEC/HOT BUS/702PP SPLY12PB2E02
105VUELEC/HOT BUS/701PP SPLY12PB1E01
** ON A/C NOT FOR ALL
121VUFLIGHT CONTROLS/SLT FLP/2POS/IND2CNP16
** ON A/C ALL
121VUFLIGHT CONTROLS/FLP/CTL AND/MONG/SYS28CVQ21
121VUFLIGHT CONTROLS/SLT/CTL/SYS27CVR21
** ON A/C NOT FOR ALL
121VUFLIGHT CONTROLS/SLT FLP/2POS/IND2CNP21
** ON A/C ALL
122VULIGHTING/INSTL LT/MAIN INST/PNL AND/PED4LFY04
Subtask 27-51-17-710-051-A
E. Do the operational test of the flap and slat system (Ref. AMM TASK 27-54-00-710-002)
   (1) If necessary, adjust the clock (Ref. AMM TASK 31-21-00-750-002).
5. Close-up
Subtask 27-51-17-860-052-A
A. Put the aircraft back to its initial configuration.
   (1) Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.01 06:58:17 UTC