Installation of the Pedal Position Adjuster Assembly
TASK 27-21-43-400-002-A
Installation of the Pedal Position Adjuster Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 27-21-43-860-054-A
Subtask 27-21-43-420-055-B
Subtask 27-21-43-860-055-A
[Rev.10 from 2021]
2026.04.01 06:48:45 UTC
Installation of the Pedal Position Adjuster Assembly
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| 98A27901002000 | 1 | PIN-RIGGING,RUDDER CONTROL |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03HBD9) | Synthetic Ester base Grease-General Purpose Low Temp - |
| No specific | lockwire corrosion resistant steel dia 0.8 mm (0.03 in.) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 811 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 45 | CLIP | AIPC 27-21-01-02-010 |
| 22 | COTTER PIN | AIPC 27-21-01-02-040 |
| 23 | COTTER PIN | AIPC 27-21-01-02-040 |
| 30 | COTTER PIN | AIPC 27-21-01-02-040 |
| 33 | COTTER PINS | AIPC 27-21-01-02-095 |
| 45 | CLIP | AIPC 27-21-81-02-010 |
| 22 | COTTER PIN | AIPC 27-21-81-02-110 |
| 23 | COTTER PIN | AIPC 27-21-81-02-110 |
| 30 | COTTER PIN | AIPC 27-21-81-02-110 |
| 33 | COTTER PINS | AIPC 27-21-81-02-250 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 29-10-00-863-003-A | Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-863-003-A-01 | Pressurize the Blue Hydraulic System with the Blue Electric Pump |
Subtask 27-21-43-860-054-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
(3) Make sure that the access door 811 is open.
(4) Make sure that the Blue hydraulic system is depressurized (Ref. AMM TASK 29-10-00-863-003).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD TRIM indicator shows 0.
(6) Make sure that the 98A27901002000 PIN-RIGGING,RUDDER CONTROL (1) is installed on the yaw/brake bellcrank (see detail B)
4. Procedure(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
(3) Make sure that the access door 811 is open.
(4) Make sure that the Blue hydraulic system is depressurized (Ref. AMM TASK 29-10-00-863-003).
(5) On the center pedestal, on the panel 110VU, make sure that the RUD TRIM indicator shows 0.
(6) Make sure that the 98A27901002000 PIN-RIGGING,RUDDER CONTROL (1) is installed on the yaw/brake bellcrank (see detail B)
Subtask 27-21-43-420-055-B
A. Installation of the Pedal Position-Adjuster Assembly
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the attachment hardware.
(4) Install the springs (41) and (42) on the rack assembly (26).
(5) Lift the lower part of the rack assembly (26) to compress the springs (41) and (42).
(6) Install the rack assembly (26) on the yoke (29) with the spacer (28) and on the structure (19) with the bolt (18).
(7) Install the washer (20), nut (21) and the new AIPC 27-21-01-02-040 COTTER PIN (22) or the AIPC 27-21-81-02-110 COTTER PIN (22).
(8) Install the washers (25), bolt (27), nut (24) and the new AIPC 27-21-01-02-040 COTTER PIN (23) or the AIPC 27-21-81-02-110 COTTER PIN (23).
(9) Install the nut (43) and the screw (44).
(a) Engage all the threads of the screw (44) but do not fully tighten it.
(10) Install the actuator (37) with the pins (36) on the structure (35) and the yoke (29).
(11) Install the washers (34) and the new AIPC 27-21-01-02-095 COTTER PINS (33) or the AIPC 27-21-81-02-250 COTTER PINS (33).
(12) Install the cable (17) through the screw (44) and to the lower part of the rack assembly (26) with the pin (40).
(14) Install the cover (5) on the structure (8) and (9).
(15) Put the cable (17) through the cover (5) and install the pin (16) on the handle (15).
(17) Install the washers (11) and the screws (10).
(18) Install the washers (7) and the screws (6).
(19) Connect the rod (39) to the yoke (29) with the screw (38).
(20) Install the washer (32), the nut (31) and the new AIPC 27-21-01-02-040 COTTER PIN (30) or the AIPC 27-21-81-02-110 COTTER PIN (30).
Subtask 27-21-43-820-050-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the attachment hardware.
(4) Install the springs (41) and (42) on the rack assembly (26).
(5) Lift the lower part of the rack assembly (26) to compress the springs (41) and (42).
(6) Install the rack assembly (26) on the yoke (29) with the spacer (28) and on the structure (19) with the bolt (18).
(7) Install the washer (20), nut (21) and the new AIPC 27-21-01-02-040 COTTER PIN (22) or the AIPC 27-21-81-02-110 COTTER PIN (22).
(8) Install the washers (25), bolt (27), nut (24) and the new AIPC 27-21-01-02-040 COTTER PIN (23) or the AIPC 27-21-81-02-110 COTTER PIN (23).
(9) Install the nut (43) and the screw (44).
(a) Engage all the threads of the screw (44) but do not fully tighten it.
(10) Install the actuator (37) with the pins (36) on the structure (35) and the yoke (29).
(11) Install the washers (34) and the new AIPC 27-21-01-02-095 COTTER PINS (33) or the AIPC 27-21-81-02-250 COTTER PINS (33).
(12) Install the cable (17) through the screw (44) and to the lower part of the rack assembly (26) with the pin (40).
NOTE: The pin (40) has a slot and a recess for the head of the cable (17).
(13) Install the locking pin (46). (14) Install the cover (5) on the structure (8) and (9).
(15) Put the cable (17) through the cover (5) and install the pin (16) on the handle (15).
NOTE: The pin (16) has a slot and a recess for the head of the cable (17).
(16) Install the new AIPC 27-21-01-02-010 CLIP (45) or the AIPC 27-21-81-02-010 CLIP (45). (17) Install the washers (11) and the screws (10).
(18) Install the washers (7) and the screws (6).
(19) Connect the rod (39) to the yoke (29) with the screw (38).
(20) Install the washer (32), the nut (31) and the new AIPC 27-21-01-02-040 COTTER PIN (30) or the AIPC 27-21-81-02-110 COTTER PIN (30).
B. Adjustment
(a) Slowly loosen the screw (44) until you get a non-control clearance at the handle (15) (Ref. Section CC).
(3) Safety the nut (43) with lockwire corrosion resistant steel dia 0.8 mm (0.03 in.).
Subtask 27-21-43-710-051-A NOTE: During the adjustment of the cable length, make sure that the terminal heads of the cables (17) are in position in their housings.
(1) Adjust the length of each rack unlocking control-cable so that the adjustment position limits, the non-control clearance (measured at the handle) is between 0.8 mm (0.0315 in.) and 2 mm (0.0787 in.). (a) Slowly loosen the screw (44) until you get a non-control clearance at the handle (15) (Ref. Section CC).
- Position 0: non-control clearance more than or equal to 0.8 mm (0.0315 in.).
- Position 12: non-control clearance less than or equal to 2 mm (0.0787 in.).
(3) Safety the nut (43) with lockwire corrosion resistant steel dia 0.8 mm (0.03 in.).
C. Operational Test
(1) Remove the pin (1) (Ref. Detail B).
(2) Do two or three operations from one stop to the other stop.
To do this:
(a) Pull the handle (15).
(b) Apply a force to move the pedals to the stop.
(c) Release the force applied on the pedals.
(d) The pedals go back freely to the opposite stop because the actuator (37) operated.
(e) Release the handle (15).
(3) When the pedal is against the stop, make sure that the non-control clearance is correct. This shows that the rack assembly (26) is locked.
Do the adjustment again if it is not correct.
(4) Do two or three pedal movements to the intermediate position 6 to check that the mechanism holds the pedals.
To do this:
(a) Pull the handle (15).
(b) Apply a force to move the pedals to the intermediate position 6.
(c) Release the handle (15).
(d) Release the force applied on the pedals.
(e) Do two or three rudder pedal movements in order to check that the mechanism holds the pedals.
5. Close-up(1) Remove the pin (1) (Ref. Detail B).
(2) Do two or three operations from one stop to the other stop.
To do this:
(a) Pull the handle (15).
(b) Apply a force to move the pedals to the stop.
(c) Release the force applied on the pedals.
(d) The pedals go back freely to the opposite stop because the actuator (37) operated.
(e) Release the handle (15).
(3) When the pedal is against the stop, make sure that the non-control clearance is correct. This shows that the rack assembly (26) is locked.
Do the adjustment again if it is not correct.
(4) Do two or three pedal movements to the intermediate position 6 to check that the mechanism holds the pedals.
To do this:
(a) Pull the handle (15).
(b) Apply a force to move the pedals to the intermediate position 6.
(c) Release the handle (15).
(d) Release the force applied on the pedals.
(e) Do two or three rudder pedal movements in order to check that the mechanism holds the pedals.
Subtask 27-21-43-860-055-A
A. Put the aircraft back to its initial configuration
(1) Make sure that the work area is clean and clear of tools and other items.
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)
Subtask 27-21-43-410-053-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)
Rigging Pin Location