W DOC AIRBUS | AMM A320F

Check Pressure Guage Reading


TASK 26-24-00-210-002-A
Check Pressure Guage Reading


ZONE: 200
FIN: 200WM ** ON A/C NOT FOR ALL
FIN: 7520MM
FIN: 7521MM
FIN: 7522MM
FIN: 7523MM
FIN: 7524MM ** ON A/C NOT FOR ALL
FIN: 7525MM ** ON A/C NOT FOR ALL
FIN: 7526MM ** ON A/C NOT FOR ALL
1. Reason for the Job
Refer to the MPD TASK: 262441-01
CHECK PRESSURE GAUGE READING
NOTE: This task is applicable only when the fire extinguisher with the pressure gauge is installed.
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 26-24-00-00
PORTABLE FIRE EXTINGUISHER - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 26-24-00-860-052-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 26-24-00-010-056-A
B. Get Access
NOTE: The fire extinguisher locations are shown with placards. The placards are bonded on the outer side of the stowage compartments, or adjacent to them.
   (1) For the location of the portable fire extinguishers refer to (Ref. AMM D/O 26-24-00-00).
   (2) If necessary, open the door/access panel of the stowage compartment.
4. Procedure
Subtask 26-24-00-210-051-A
A. Check on the pressure gauge reading from the fire extinguisher(s):
   (1) On the portable fire extinguisher(s), make sure that the needle is in the green area of the pressure gauge.
5. Close-up
Subtask 26-24-00-410-054-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) If necessary, close the door/access panel of the stowage or compartment.
Subtask 26-24-00-860-051-A
B. Put the aircraft back to its initial configuration.
   (1) Remove all the fixtures, tools,test and support equipment used during this procedure.
   (2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:46:51 UTC