W DOC AIRBUS | AMM A320F

Detailed Inspection of Distribution Piping


TASK 26-22-00-210-001-A
Detailed Inspection of Distribution Piping


ZONE: 313
1. Reason for the Job
Refer to the MPD TASK: 262200-04
DETAILED INSPECTION OF DISTRIBUTION PIPING
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)
No specific
1
FLASHLIGHT
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
313
TAIL CONE APU AIR INTAKE AREA
314AR, 315AL
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 52-41-00-010-001-A
Open the APU Doors for Access
TASK 52-41-00-410-001-A
Close the APU Doors after Access
TASK 52-41-23-010-801-A
Opening of Access Door 314AR
TASK 52-41-23-410-801-A
Closing of Access Door 314AR
3. Job Set-up
Subtask 26-22-00-941-056-A
A. Put the WARNING NOTICE(S) on the overhead panel 25VU to tell the persons not to operate the APU.
Subtask 26-22-00-865-065-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
Subtask 26-22-00-010-055-A
C. Get Access
WARNING: BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
   (1) Put on and attach a safety harness before you start work in the work area
   (2) Put the ACCESS PLATFORM 4M (13 FT) in position below the APU compartment.
   (3) Open the APU access door 315AL (Ref. AMM TASK 52-41-00-010-001).
   (4) Set the light switch 11LJ to the ON position.
   (5) Open access door 314AR and safety it in the open position.
(Ref. AMM TASK 52-41-23-010-801).
   (6) If necessary, use a FLASHLIGHT.
4. Procedure
Subtask 26-22-00-210-058-A
A. Inspection of the APU Fire-Extinguishing Distribution Piping
   (1) Get access through door 314AR.
     (a) Do a detailed inspection of the fire-extinguisher distribution piping for cracks, damages and condition.
   (2) Get access through door 315AL.
     (a) Do a detailed inspection of the discharge nozzle for cracks, damages, condition and blockage.
5. Close-up
Subtask 26-22-00-410-056-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close access door 314AR (Ref. AMM TASK 52-41-23-410-801).
   (3) Set the light switch 11LJ to the OFF position.
   (4) Close the APU access door 315AL (Ref. AMM TASK 52-41-00-410-001).
   (5) Remove the access platform(s).
   (6) Remove the WARNING NOTICE(S).
Subtask 26-22-00-865-066-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41