W DOC AIRBUS | AMM A320F

Removal of the Programming Dongle


TASK 25-65-35-000-003-A
Removal of the Programming Dongle


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
261BC
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 25-23-42-000-002-A
Removal of the Ceiling Panels - Aft Utility Area
F DONGLE (141 MX) ** ON A/C NOT FOR ALL
F DONGLE (141 MX) ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-65-35-861-052-B ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-65-35-010-053-B ** ON A/C NOT FOR ALL
B. Get access to the Programming Dongle
   (1) Remove the ceiling panel 261BC (Ref. AMM TASK 25-23-42-000-002).
4. Procedure
Subtask 25-65-35-020-052-B ** ON A/C NOT FOR ALL
A. Removal of the Programming Dongle 141MX
F DONGLE (141 MX) ** ON A/C NOT FOR ALL
F DONGLE (141 MX) ** ON A/C NOT FOR ALL
   (1) Set the ON/OFF/ARM switch (6) to the OFF position.
   (2) Disconnect the electrical connector (3) or programming-dongle (2) from the connector (7) of the ELT (4).
   (3) Disconnect the electrical connector (1) from the bracket (5).
   (4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.