W DOC AIRBUS | AMM A320F

Installation of the Tie Down and Net Attachment Fittings of the Aft and Bulk Cargo-Compartments


TASK 25-55-41-400-001-A
Installation of the Tie Down and Net Attachment Fittings of the Aft and Bulk Cargo-Compartments


WARNING: DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
  • FLUSH IT AWAY WITH CLEAN WATER
  • GET MEDICAL AID.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
ZONE: 150
ZONE: 160
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
SCRAPER - NON METALLIC
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06AAB1)
Polysulfide Sealant-General Purpose Fillet -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
160
BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-006-A
Open the Bulk Cargo-Compartment Door
TASK 52-30-00-860-008-A
Close the Bulk Cargo-Compartment Door
F Application of Sealants ** ON A/C NOT FOR ALL
F Application of Sealants ** ON A/C NOT FOR ALL
F Application of Sealants ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-55-41-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aft cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the aft cargo-compartment door.
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the bulk cargo-compartment door.
   (4) Make sure that the bulk cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-006).
   (5) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position on the control panel of the aft Cargo Loading System (CLS) to tell persons not to use it.
Subtask 25-55-41-860-050-C ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the aft cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-001).
   (3) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the aft cargo-compartment door.
   (4) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the bulk cargo-compartment door.
   (5) Make sure that the bulk cargo-compartment door is open (Ref. AMM TASK 52-30-00-860-006).
   (6) Make sure that the light switch is set to the 'ON' position.
Subtask 25-55-41-860-050-D ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aft cargo compartment door is open (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the aft cargo compartment door.
Subtask 25-55-41-865-054-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUSEMI AUTO CLS-AFT103MYD08
2001VUSEMI AUTO CLS-AFT102MYD06
4. Procedure
Subtask 25-55-41-910-050-B
A. Preparation for Installation:
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Use a SCRAPER - NON METALLIC to remove the unwanted sealant from the component interface and the adjacent area.
   (3) Use a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and the Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean the component interface and the adjacent area.
   (4) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (5) Apply the Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the screws which attach the tie-down and net attachment fittings and to the bottom surface of the tie down point.
   (6) To prevent damage to the cargo nets when you remove the attachment fittings from the ceiling area:
     (a) Safety one or two fittings of each net with tie wraps.
Subtask 25-55-41-420-050-E ** ON A/C NOT FOR ALL
B. Installation of the Tie-Down and Net Attachment Fittings in the Floor Area of the AFT Cargo-Compartment
   (1) Install the tie-down points (2):
NOTE: The installation procedure for all the tie-down points (2) is the same. Therefore, the installation procedure for one tie-down point (2) only is given here.
     (a) Put the tie-down point (2) in position at the structure (3).
     (b) Install the screws (1) and the nuts (4).
   (2) Install the tie-down points (8):
NOTE: The installation procedure for all the tie-down points (8) is the same. Therefore, the installation procedure for one tie-down point (8) only is given here.
     (a) Put the plug housing (9) in position at the structure (3), if removed.
     (b) Put the tie-down point (8) in position at the plug housing (9).
     (c) Install the screws (7) and the nuts (10).
   (3) Install the seat-track sections (12):
NOTE: The installation procedure for all the seat-track sections (12) is the same. Therefore, the installation procedure for one seat-track section (12) only is given here.
     (a) Put the seat-track section (12) in position at the structure (3).
     (b) Install the screws (11) and the nuts (13).
   (4) Install the tie-down fittings (15):
NOTE: The installation procedure for all the tie-down fittings (15) is the same. Therefore, the installation procedure for one tie-down fitting (15) only is given here.
     (a) Put the tie-down fitting (15) in position at the structure (3).
     (b) Install the screws (14) and the nuts (16).
   (5) Install the tie-down fittings (19):
NOTE: The installation procedure for all the tie-down fittings (19) is the same. Therefore, the installation procedure for one tie-down fitting (19) only is given here.
     (a) Put the tie-down fitting (19) in position at the structure (3).
     (b) Install the screws (17) and the nuts (21).
     (c) Install the screws (18) and the nuts (20).
   (6) Install the tie-down fitting (23):
     (a) Put the tie-down fitting (23) in position at the structure (3).
     (b) Install the screws (22) and the nuts (24).
   (7) Install the tie-down fittings (26):
NOTE: The installation procedure for all the tie-down fittings (26) is the same. Therefore, the installation procedure for one tie-down fitting (26) only is given here.
     (a) Put the tie-down fitting (26) in position at the structure (3).
     (b) Install the screws (25) and the nuts (27).
   (8) Install the tie-down fitting (29):
     (a) Put the tie-down fitting (29) in position at the structure (3).
     (b) Install the screws (28) and the nuts (30).
   (9) Install the tie-down fitting (32):
     (a) Put the tie-down fitting (32) in position at the structure (3).
     (b) Install the screws (31) and the nuts (33).
   (10) Install the cargo net(s) (5), if removed:
     (a) Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
     (b) Connect the net fittings (6) to the net attachment fittings.
Subtask 25-55-41-420-050-H ** ON A/C NOT FOR ALL
B. Installation of the Tie-Down and Net Attachment Fittings in the Floor Area of the AFT Cargo-Compartment
   (1) Install the tie-down points (2):
NOTE: The installation procedure for all the tie-down points (2) is the same. Therefore, the installation procedure for one tie-down point (2) only is given here.
     (a) Put the tie-down point (2) in position at the structure (3).
     (b) Install the screws (1) and the nuts (4).
   (2) Install the tie-down points (8):
NOTE: The installation procedure for all the tie-down points (8) is the same. Therefore, the installation procedure for one tie-down point (8) only is given here.
     (a) Put the plug housing (9) in position at the structure (3), if removed.
     (b) Put the tie-down point (8) in position at the plug housing (9).
     (c) Install the screws (7) and the nuts (10).
   (3) Install the seat-track sections (12):
NOTE: The installation procedure for all the seat-track sections (12) is the same. Therefore, the installation procedure for one seat-track section (12) only is given here.
     (a) Put the seat-track section (12) in position at the structure (3).
     (b) Install the screws (11) and the nuts (13).
   (4) Install the tie-down fittings (15):
NOTE: The installation procedure for all the tie-down fittings (15) is the same. Therefore, the installation procedure for one tie-down fitting (15) only is given here.
     (a) Put the tie-down fitting (15) in position at the structure (3).
     (b) Install the screws (14) and the nuts (16).
   (5) Install the tie-down fitting (18):
     (a) Put the tie-down fitting (18) in position at the structure (3).
     (b) Install the screws (17) and the nuts (19).
   (6) Install the tie-down fitting (21):
     (a) Put the tie-down fitting (21) in position at the structure (3).
     (b) Install the screws (20) and the nuts (22).
   (7) Install the tie-down fitting (24):
     (a) Put the tie-down fitting (24) in position at the structure (3).
     (b) Install the screws (23) and the nuts (25).
   (8) Install the tie-down fittings (27):
NOTE: The installation procedure for all the tie-down fittings (27) is the same. Therefore, the installation procedure for one tie-down fitting (27) only is given here.
     (a) Put the tie-down fitting (27) in position at the structure (3).
     (b) Install the screws (26) and the nuts (28).
   (9) Install the tie-down fittings (30):
NOTE: The installation procedure for all the tie-down fittings (30) is the same. Therefore, the installation procedure for one tie-down fitting (30) only is given here.
     (a) Put the tie-down fitting (30) in position at the structure (3).
     (b) Install the screws (29) and the nuts (31).
   (10) Install the tie-down fitting (33):
     (a) Put the tie-down fitting (33) in position at the structure (3).
     (b) Install the screws (32) and the nuts (34).
   (11) Install the tie-down fitting (36):
     (a) Put the tie-down fitting (36) in position at the structure (3).
     (b) Install the screws (35) and the nuts (37).
   (12) Install the cargo net(s) (5), if removed:
     (a) Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
     (b) Connect the net fittings (6) to the net attachment fittings.
Subtask 25-55-41-420-050-I ** ON A/C NOT FOR ALL
B. Installation of the Tie-Down and Net Attachment Fittings in the Floor Area of the AFT Cargo-Compartment
   (1) Install the tie-down points (2):
NOTE: The installation procedure for all the tie-down points (2) is the same. Therefore, the installation procedure for one tie-down point (2) only is given here.
     (a) Put the tie-down point (2) in position at the structure (3).
     (b) Install the screws (1) and the nuts (4).
   (2) Install the tie-down points (8):
NOTE: The installation procedure for all the tie-down points (8) is the same. Therefore, the installation procedure for one tie-down point (8) only is given here.
     (a) Put the plug housing (9) in position at the structure (3), if removed.
     (b) Put the tie-down point (8) in position at the plug housing (9).
     (c) Install the screws (7) and the nuts (10).
   (3) Install the tie-down fittings (12):
NOTE: The installation procedure for all the tie-down fittings (12) is the same. Therefore, the installation procedure for one tie-down fitting (12) only is given here.
     (a) Put the tie-down fitting (12) in position at the structure (3).
     (b) Install the screws (11) and the nuts (13).
   (4) Install the tie-down fittings (15):
NOTE: The installation procedure for all the tie-down fittings (15) is the same. Therefore, the installation procedure for one tie-down fitting (15) only is given here.
     (a) Put the tie-down fitting (15) in position at the structure (3).
     (b) Install the screws (14) and the nuts (16).
   (5) Install the tie-down fittings (18):
NOTE: The installation procedure for all the tie-down fittings (18) is the same. Therefore, the installation procedure for one tie-down fitting (18) only is given here.
     (a) Put the tie-down fitting (18) in position at the structure (3).
     (b) Install the screws (17) and the nuts (19).
   (6) Install the seat-track sections (21):
NOTE: The installation procedure for all the seat-track sections (21) is the same. Therefore, the installation procedure for one seat-track section (21) only is given here.
     (a) Put the seat-track section (21) in position at the structure (3).
     (b) Install the screws (20) and the nuts (22).
   (7) Install the tie-down fitting (24):
     (a) Put the tie-down fitting (24) in position at the structure (3).
     (b) Install the screws (23) and the nuts (25).
   (8) Install the tie-down fittings (27):
NOTE: The installation procedure for all the tie-down fittings (27) is the same. Therefore, the installation procedure for one tie-down fitting (27) only is given here.
     (a) Put the tie-down fitting (27) in position at the structure (3).
     (b) Install the screws (26) and the nuts (28).
   (9) Install the tie-down fitting (30):
     (a) Put the tie-down fitting (30) in position at the structure (3).
     (b) Install the screws (29) and the nuts (31).
   (10) Install the tie-down fitting (33):
     (a) Put the tie-down fitting (33) in position at the structure (3).
     (b) Install the screws (32) and the nuts (34).
   (11) Install the tie-down points (40):
NOTE: The installation procedure for all the tie-down points (40) is the same. Therefore, the installation procedure for one tie-down point (40) only is given here.
     (a) Put the plug housing (42) in position at the structure (3), if removed.
     (b) Install the screws (41) and the nuts (43).
     (c) Put the tie-down point (40) in position at the plug housing (42).
     (d) Install the screws (44) and the nuts (43).
   (12) Install the cargo net(s) (5), if removed:
     (a) Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
     (b) Connect the net fittings (6) to the net attachment fittings.
Subtask 25-55-41-420-051-A
C. Installation of the Tie-Down and Net Attachment Fittings in the Ceiling Area of the Aft Cargo Compartment
   (1) Install the tie-down points (3):
NOTE: The installation procedure for all the tie-down points (3) is the same. Therefore, the installation procedure for one tie-down point (3) only is given here.
     (a) Install the spacer (2), if removed:
       1 Put the spacer (2) in position at the structure (1).
       2 Install the screws (5) in the spacer (2).
       3 Tighten the screws (5).
     (b) Put the tie-down point (3) in position at the spacer (2).
     (c) Install the screws (4) in the tie-down point (3).
     (d) Tighten the screws (4).
   (2) Install the tie-down points (6):
NOTE: The installation procedure for all the tie-down points (6) is the same. Therefore, the installation procedure for one tie-down point (6) only is given here.
     (a) Put the tie-down point (6) in position at the structure (1).
     (b) Install the screws (7) in the tie-down point (6).
     (c) Tighten the screws (7).
   (3) Install the stanchion fitting (10):
     (a) Put the stanchion fitting (10) in position at the structure (1).
     (b) Install the screws (11) in the stanchion fitting (10).
     (c) Tighten the screws (11).
   (4) Install the cargo net(s) (9), if removed:
     (a) Put the cargo net(s) (9) in position at the applicable net attachment fittings of the cargo compartment floor and ceiling areas.
     (b) Connect the net fittings (8) to the net attachment fittings.
Subtask 25-55-41-420-052-B ** ON A/C NOT FOR ALL
D. Installation of the Tie-Down and Net Attachment Fittings in the Floor Area of the Bulk Cargo-Compartment
   (1) Install the tie-down points (2):
NOTE: The installation procedure for all the tie-down points (2) is the same. Therefore, the installation procedure for one tie-down point (2) only is given here.
     (a) Put the tie-down point (2) in position at the structure (3).
     (b) Install the screws (1) and the nuts (4).
   (2) Install the tie-down points (8):
NOTE: The installation procedure for all the tie-down points (8) is the same. Therefore, the installation procedure for one tie-down point (8) only is given here.
     (a) Put the plug housing (9) in position at the structure (3), if removed.
     (b) Put the tie-down point (8) in position at the plug housing (9).
     (c) Install the screws (7) and the nuts (10).
   (3) Install the tie-down fittings (12):
NOTE: The installation procedure for all the tie-down fittings (12) is the same. Therefore, the installation procedure for one tie-down fitting (12) only is given here.
     (a) Put the tie-down fitting (12) in position at the structure (3).
     (b) Install the screws (11) and the nuts (13).
   (4) Install the seat-track sections (15):
NOTE: The installation procedure for all the seat-track sections (15) is the same. Therefore, the installation procedure for one seat-track section (15) only is given here.
     (a) Put the seat-track section (15) in position at the structure (3).
     (b) Install the screws (14) and the nuts (16).
   (5) Install the tie-down fitting (18):
     (a) Put the tie-down fitting (18) in position at the structure (3).
     (b) Install the screws (17) and the nuts (19).
   (6) Install the tie-down fittings (21):
NOTE: The installation procedure for all the tie-down fittings (21) is the same. Therefore, the installation procedure for one tie-down fitting (21) only is given here.
     (a) Put the tie-down fitting (21) in position at the structure (3).
     (b) Install the screws (20) and the nuts (22).
   (7) Install the tie-down fitting (24):
     (a) Put the tie-down fitting (24) in position at the structure (3).
     (b) Install the screws (23) and the nuts (25).
   (8) Install the tie-down fitting (27):
     (a) Put the tie-down fitting (27) in position at the structure (3).
     (b) Install the screws (26) and the nuts (28).
   (9) Install the cargo net(s) (5), if removed:
     (a) Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
     (b) Connect the net fittings (6) to the net attachment fittings.
Subtask 25-55-41-420-053-A ** ON A/C NOT FOR ALL
E. Installation of the Tie-Down and Net Attachment Fittings in the Ceiling Area of the Bulk Cargo-Compartment
   (1) Install the tie-down points (3):
NOTE: The installation procedure for all the tie-down points (3) is the same. Therefore, the installation procedure for one tie-down point (3) only is given here.
     (a) Install the spacer (2), if removed:
       1 Put the spacer (2) in position at the structure (1).
       2 Install the screws (5) in the spacer (2).
     (b) Put the tie-down point (3) in position at the spacer (2).
     (c) Install the screws (4) in the tie-down point (3).
   (2) Install the tie-down points (6):
NOTE: The installation procedure for all the tie-down points (6) is the same. Therefore, the installation procedure for one tie-down point (6) only is given here.
     (a) Put the tie-down point (6) in position at the structure (1).
     (b) Install the screws (7) in the tie-down point (6).
   (3) Install the stanchion fittings (10):
NOTE: The installation procedure for all the stanchion fittings (10) is the same. Therefore, the installation procedure for one stanchion fitting (10) only is given here.
     (a) Put the stanchion fitting (10) in position at the structure (1).
     (b) Install the screws (11) in the stanchion fitting (10).
   (4) Install the cargo net(s) (9), if removed:
     (a) Put the cargo net(s) (9) in position at the applicable net attachment fittings of the cargo-compartment floor and ceiling areas.
     (b) Connect the net fittings (8) to the net attachment fittings.
Subtask 25-55-41-420-052-D ** ON A/C NOT FOR ALL
F. Installation of the Tie-Down and Net Attachment Fittings in the Floor Area of the Bulk Cargo Compartment
   (1) Install the tie-down points (2):
NOTE: The installation procedure for all the tie-down points (2) is the same. Therefore, the installation procedure for one tie-down point (2) only is given here.
     (a) Put the tie-down point (2) in position at the structure (3).
     (b) Install the screws (1) and the nuts (4).
     (c) Tighten the nuts (4) and the screws (1).
   (2) Install the tie-down points (8):
NOTE: The installation procedure for all the tie-down points (8) is the same. Therefore, the installation procedure for one tie-down point (8) only is given here.
     (a) Put the plug housing (9) in position at the structure (3), if removed.
     (b) Put the tie-down point (8) in position at the plug housing (9).
     (c) Install the screws (7) and the nuts (10).
     (d) Tighten the nuts (10) and the screws (7).
   (3) Install the tie-down fittings (12):
NOTE: The installation procedure for all the tie-down fittings (12) is the same. Therefore, the installation procedure for one tie-down fitting (12) only is given here.
     (a) Put the tie-down fitting (12) in position at the structure (3).
     (b) Install the screws (11) and the nuts (13).
     (c) Tighten the nuts (13) and the screws (11).
   (4) Install the cargo net(s) (5), if removed:
     (a) Put the cargo net(s) (5) in position at the applicable net attachment fittings of the cargo compartment floor and ceiling areas.
     (b) Connect the net fittings (6) to the net attachment fittings.
Subtask 25-55-41-420-053-C ** ON A/C NOT FOR ALL
G. Installation of the Tie-Down and Net Attachment Fittings in the Ceiling Area of the Bulk Cargo Compartment
   (1) Install the tie-down points (3):
NOTE: The installation procedure for all the tie-down points (3) is the same. Therefore, the installation procedure for one tie-down point (3) only is given here.
     (a) Install the spacer (2), if removed:
       1 Put the spacer (2) in its correct installation position at the structure (1).
       2 Install the screws (5) in the spacer (2).
       3 Tighten the screws (5).
     (b) Put the tie-down point (3) in its correct installation position at the spacer (2).
     (c) Install the screws (4) in the tie-down point (3).
     (d) Tighten the screws (4).
   (2) Install the tie-down points (6):
NOTE: The installation procedure for all the tie-down points (6) is the same. Therefore, the installation procedure for one tie-down point (6) only is given here.
     (a) Put the tie-down point (6) in its correct installation position at the structure (1).
     (b) Install the screws (7) in the tie-down point (6).
     (c) Tighten the screws (7).
   (3) Install the cargo net(s) (9), if removed:
     (a) Put the cargo net(s) (9) in position at the applicable net attachment fittings of the cargo compartment floor and ceiling areas.
     (b) Connect the net fittings (8) to the net attachment fittings.
Subtask 25-55-41-390-050-A ** ON A/C NOT FOR ALL
H. Application of Sealants
F Application of Sealants ** ON A/C NOT FOR ALL
F Application of Sealants ** ON A/C NOT FOR ALL
   (1) For the tie-down and net attachment fittings installed in a closed cutout:
     (a) Make sure that the gap between the plug housing (2) and the cutout in the floor panel (1) is clean.
     (b) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) (3) and fill the gap between the plug housing (2) and the cutout in the floor panel (1).
   (2) For the tie-down and net attachment fittings installed in an open cutout:
     (a) Make sure that the gaps between the tie-down fitting (4) and the cutouts in the floor panels (1) are clean.
     (b) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) (3) and fill the gaps between the tie-down fitting (4) and the cutouts in the floor panels (1).
   (3) Use a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and the Non Aqueous Cleaner-General - - (Material No.08BAA9) to remove the unwanted sealant from the component interface and the adjacent area.
Subtask 25-55-41-390-050-B ** ON A/C NOT FOR ALL
H. Application of Sealants
F Application of Sealants ** ON A/C NOT FOR ALL
   (1) For the tie-down and net attachment fittings installed in a closed cutout:
     (a) Make sure that the gaps between the tie-down point (4) and the plug housing (2) are clean.
     (b) Make sure that the gap between the plug housing (2) and the cutout in the floor panel (1) is clean.
     (c) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) (5) and fill the gaps between the tie-down point (4) and the plug housing (2).
     (d) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) (3) and fill the gap between the plug housing (2) and the cutout in the floor panel (1).
   (2) For the tie-down and net attachment fittings installed in an open cutout:
     (a) Make sure that the gaps between the tie-down fitting (6) and the cutouts in the floor panels (1) are clean.
     (b) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) (3) and fill the gaps between the tie-down fitting (6) and the cutouts in the floor panels (1).
   (3) Use a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and the Non Aqueous Cleaner-General - - (Material No.08BAA9) to remove the unwanted sealant from the component interface and the adjacent area.
5. Close-up
Subtask 25-55-41-865-055-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2001VUSEMI AUTO CLS-AFT103MYD08
2001VUSEMI AUTO CLS-AFT102MYD06
Subtask 25-55-41-410-050-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the bulk cargo-compartment door (Ref. AMM TASK 52-30-00-860-008).
   (3) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the access platform(s).
Subtask 25-55-41-410-050-C ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Set the light switch to off.
   (3) Close the bulk cargo-compartment door (Ref. AMM TASK 52-30-00-860-008).
   (4) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the access platform(s).
   (6) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Subtask 25-55-41-410-050-D ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the aft cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 23:39:38 UTC