Removal of the Lining
TASK 25-45-26-000-001-A
Removal of the Lining
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 25-45-26-861-050-A
Subtask 25-45-26-020-050-B
[Rev.10 from 2021]
2026.03.31 23:36:38 UTC
Removal of the Lining
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 25-45-38-000-001-A | Removal of the Washbasin |
Subtask 25-45-26-861-050-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-45-26-010-050-A (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
B. Get Access
(1) If the washbasin is installed, remove it (Ref. AMM TASK 25-45-38-000-001) or (Ref. AMM D/O 38-32-43-00).
4. Procedure(1) If the washbasin is installed, remove it (Ref. AMM TASK 25-45-38-000-001) or (Ref. AMM D/O 38-32-43-00).
Subtask 25-45-26-020-050-B
A. Remove the Lining
(1) Remove the rollers (5) and the roller bracket (4).
(2) Remove the screws (2), the washers (3) and the lining (1).
(1) Remove the rollers (5) and the roller bracket (4).
(2) Remove the screws (2), the washers (3) and the lining (1).
Wash Basin Lining