1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.3 and 0.2 m.daN (26.55 and 17.70 lbf.in ) T
No specific
Torque wrench: range to between 0.35 and 0.2 m.daN (30.97 and 17.70 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 25-45-21-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-21-210-050-A
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-45-21-420-050-A
B. Installation of the Door Locks
   (1) Installation of the Single Blade Door lock:
     (a) Open the lavatory door.
     (b) Put the spring loaded cover (8) and the door lock (1) in position in the lavatory door.
     (c) Lift the flap (9) and install the screws (6) and the knurled pin (7).
     (d) Install the screws (4) and the knob (2).
     (e) Put the section (5) in position and install the screws (3).
     (f) Operate the door lock (1) and make sure it operates correctly.
     (g) Close the lavatory door.
   (2) Installation of the Bi-folding Door lock:
     (a) Open the lavatory door.
     (b) Put the spring loaded cover (12) and the door lock (1) in position in the lavatory door.
     (c) Lift the flap (11) and install the screws (9) and the knurled pin (10).
     (d) Install the screws (7) and the knob (2).
     (e) Torque the knob (2) to between 0.35 and 0.2 m.daN (30.97 and 17.70 lbf.in ) T.
     (f) For the Person with Reduced Mobility (PRM) lavatory, install the bolt (4) and torque the bolt (4) to between 0.35 and 0.2 m.daN (30.97 and 17.70 lbf.in )
T.
     (g) Install the knob (3) to the bolt (4) and torque the set-screw (5) to between 0.3 and 0.2 m.daN (26.55 and 17.70 lbf.in )
T.
     (h) Put the section (8) in position and install the screws (6).
     (i) Operate the door lock (1) and make sure it operates correctly.
     (j) Close the lavatory door.
5. Close-up
Subtask 25-45-21-862-050-A
[Rev.10 from 2021] 2026.03.31 23:36:17 UTC