1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 25-45-16-860-051-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 25-45-16-210-051-A ** ON A/C NOT FOR ALL
Subtask 25-45-16-862-051-A ** ON A/C NOT FOR ALL
[Rev.9 from 2019]
2026.03.31 23:35:59 UTC
Installation of the Ashtray of the Space Flex Lavatory
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-45-16-860-051-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 25-45-16-210-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-45-16-420-052-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Make sure that the parts retained from the removed component are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
B. Installation of the Ashtray of the Space Flex Lavatory
(1) Install the ashtray covers (2) on the ashtray cases (1).
(2) Close the lavatory doors.
5. Close-up(1) Install the ashtray covers (2) on the ashtray cases (1).
(2) Close the lavatory doors.
Subtask 25-45-16-862-051-A ** ON A/C NOT FOR ALL
Ashtray of the Space Flex Lavatory