Installation of the Ashtray of the Space Flex Lavatory


TASK 25-45-16-400-802-A
Installation of the Ashtray of the Space Flex Lavatory


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 25-45-16-860-051-A ** ON A/C NOT FOR ALL
A. Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-16-210-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-45-16-420-052-A ** ON A/C NOT FOR ALL
B. Installation of the Ashtray of the Space Flex Lavatory
   (1) Install the ashtray covers (2) on the ashtray cases (1).
   (2) Close the lavatory doors.
5. Close-up
Subtask 25-45-16-862-051-A ** ON A/C NOT FOR ALL
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).