Installation of the Lavatory Mirror


TASK 25-45-13-400-001-A
Installation of the Lavatory Mirror


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 25-45-13-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-13-210-050-A
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-45-13-420-050-A
B. Installation of the Lavatory Mirror
   (1) Position the mirror attachment brackets (7) on the Lavatory mirror (1) and install the screws (6).
   (2) Install the lavatory mirror (1) with the attachment brackets (7) on the screws (2) and the foam plates (3).
   (3) Install the screw (5) and if necessary the angle (4).
5. Close-up
Subtask 25-45-13-862-050-A
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).