W DOC AIRBUS | AMM A320F

Opening/Closing of the Movable Wall Section of Lavatory D/Ds to Move a Stretcher


TASK 25-40-00-840-001-A
Opening/Closing of the Movable Wall Section of Lavatory D/Ds to Move a Stretcher


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-65-00-00
MISCELLANEOUS EMERGENCY EQUIPMENT - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 25-40-00-861-058-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-40-00-010-059-A ** ON A/C NOT FOR ALL
A. Opening of the Movable Wall Section
F Movable Wall Section ** ON A/C NOT FOR ALL
   (1) Open the lavatory doors as follows:
     (a) If the single blade door (2) is installed:
       1 Fully open the single blade door (2).
     (b) If the bi-folding door (4) is installed:
       1 Unlock the latches (8) and fully open the bi-folding door (4).
       2 Lock the latches (8).
   (2) Remove the headrest (7) from the Cabin Attendant Seat (CAS).
   (3) If necessary, remove the Protective Breathing Equipment (PBE) (3) (Ref. AMM D/O 25-65-00-00).
   (4) Disengage the latches (5) and (6) and open the movable wall section (1).
Subtask 25-40-00-410-060-A ** ON A/C NOT FOR ALL
B. Closing of the Movable Wall Section
F Movable Wall Section ** ON A/C NOT FOR ALL
   (1) Close the movable wall section (1) and engage the latches (5) and (6).
   (2) If the PBE (3) is removed, install it (Ref. AMM D/O 25-65-00-00).
   (3) Install the headrest (7) on the CAS.
   (4) Close the lavatory doors as follows:
     (a) If the single blade door (2) is installed:
       1 Close the single blade door (2).
     (b) If the bi-folding door (4) is installed:
       1 Unlock the latches (8) and close the bi-folding door (4).
       2 Lock the latches (8).
   (5) Make sure that the work area is clean and clear of tools and other items.
5. Close-up
Subtask 25-40-00-862-059-A ** ON A/C NOT FOR ALL
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:34:46 UTC