Installation of the Air Chiller Unit - Galley 2
TASK 25-34-51-400-003-A
Installation of the Air Chiller Unit - Galley 2
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-34-51-860-052-A ** ON A/C NOT FOR ALL
Subtask 25-34-51-210-052-A ** ON A/C NOT FOR ALL
Subtask 25-34-51-410-052-A ** ON A/C NOT FOR ALL
[Rev.9 from 2019]
2026.03.31 23:34:04 UTC
Installation of the Air Chiller Unit - Galley 2
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 220
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 220 | FWD CAB UTILITY AREAS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-34-51-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) If necessary, make sure that the decorative material(s) is (are) removed.
(3) On the overhead panel, on AIR COND panel 30VU:
(a) Make sure that these pushbutton switches are released:
(4) On the High Pressure (HP) and Low Pressure (LP) ground-air connectors:
(a) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to connect the ground air supply.
Subtask 25-34-51-865-083-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) If necessary, make sure that the decorative material(s) is (are) removed.
(3) On the overhead panel, on AIR COND panel 30VU:
(a) Make sure that these pushbutton switches are released:
- APU BLEED pushbutton switch (the ON legend is off)
- All the ENG BLEED pushbutton switches (the OFF legends are on)
- PACK 1 and PACK 2 pushbutton switches (the OFF legends are on).
(4) On the High Pressure (HP) and Low Pressure (LP) ground-air connectors:
(a) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to connect the ground air supply.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
Subtask 25-34-51-210-052-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do a visual inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-34-51-420-053-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do a visual inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the Air Chiller Unit - Galley 2
(1) Unless specified, TORQUE all nuts, bolts and screws (Ref. AMM TASK 20-21-11-911-001).
(a) Carefully put the air chiller (7) in position and install the screws (8).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector (10) to the connector (9).
(e) Put the side panel (3) in position and install the screws (4).
(f) Put the shelf assembly (5) in position and install the screws (6).
(g) Put the panel (2) in position and install the screws (4).
Subtask 25-34-51-865-084-A ** ON A/C NOT FOR ALL (1) Unless specified, TORQUE all nuts, bolts and screws (Ref. AMM TASK 20-21-11-911-001).
WARNING:
SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
(2) Install the Air Chiller (a) Carefully put the air chiller (7) in position and install the screws (8).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector (10) to the connector (9).
(e) Put the side panel (3) in position and install the screws (4).
(f) Put the shelf assembly (5) in position and install the screws (6).
(g) Put the panel (2) in position and install the screws (4).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-34-51-942-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
D. Safety Precautions
(1) Remove the WARNING NOTICE(S) from:
- The HP and LP ground-air connectors
- AIR COND panel 30VU.
Subtask 25-34-51-710-052-A ** ON A/C NOT FOR ALL (1) Remove the WARNING NOTICE(S) from:
- The HP and LP ground-air connectors
- AIR COND panel 30VU.
E. Operational Test
(1) Do the operational test of the air chiller unit as follows:
(a) On the galley control panel, make sure that all the applicable circuit breakers of the forward galley are closed.
5. Close-up(1) Do the operational test of the air chiller unit as follows:
(a) On the galley control panel, make sure that all the applicable circuit breakers of the forward galley are closed.
| ACTION | RESULT |
|---|---|
1.On the overhead panel, on ELEC panel 35VU:
| On GALLEY pushbutton switch (2XA):
|
On the galley control panel:
| |
2.On the galley control panel:
| On the galley control panel:
|
|
|
3.On the overhead panel, on ELEC panel 35VU:
| On GALLEY pushbutton switch (2XA):
|
On the galley control panel:
|
Subtask 25-34-51-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Install all the decorative material, if removed.
Subtask 25-34-51-862-052-A ** ON A/C NOT FOR ALL (1) Install all the decorative material, if removed.
Air Chiller - Galley 2