Installation of the Air Chiller Unit - Aft Galley
TASK 25-34-51-400-002-A
Installation of the Air Chiller Unit - Aft Galley
Self Explanatory
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-34-51-860-051-A ** ON A/C NOT FOR ALL
Subtask 25-34-51-210-051-E ** ON A/C NOT FOR ALL
Subtask 25-34-51-410-051-L ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:15:25 UTC
Installation of the Air Chiller Unit - Aft Galley
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
ZONE: 260
1. Reason for the JobSelf Explanatory
NOTE: More than one person is necessary for this procedure.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 260 | AFT CABIN UTILITY AREA |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-34-51-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the contents are removed from the galley.
(3) Make sure that the decorative material(s) is (are) removed.
(4) Make sure that the galley trolley(s) is (are) removed.
(5) Make sure that on the AIR section of panel 30VU:
(a) The APU BLEED, ENG 1 BLEED, ENG 2 BLEED and PACK 1 and PACK 2 pushbutton switches are in the OFF position.
(6) Make sure that on the High Pressure (HP) and the Low Pressure (LP) ground connectors, the WARNING NOTICE(S) is (are) in position to tell persons not to connect the ground air supply.
Subtask 25-34-51-865-089-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the contents are removed from the galley.
(3) Make sure that the decorative material(s) is (are) removed.
(4) Make sure that the galley trolley(s) is (are) removed.
(5) Make sure that on the AIR section of panel 30VU:
(a) The APU BLEED, ENG 1 BLEED, ENG 2 BLEED and PACK 1 and PACK 2 pushbutton switches are in the OFF position.
NOTE: For the APU BLEED the ON legend is off.
For the ENG 1 BLEED and the ENG 2 BLEED the OFF legends are on.
For PACK 1 and PACK 2 the OFF legends are on.
(b) The WARNING NOTICE(S) is (are) in position to tell persons not to operate these pushbutton For the ENG 1 BLEED and the ENG 2 BLEED the OFF legends are on.
For PACK 1 and PACK 2 the OFF legends are on.
(6) Make sure that on the High Pressure (HP) and the Low Pressure (LP) ground connectors, the WARNING NOTICE(S) is (are) in position to tell persons not to connect the ground air supply.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
Subtask 25-34-51-210-051-E ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do a visual inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-34-51-420-052-W ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do a visual inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the Air Chiller Unit - AFT Galley
(1) Unless specified, TORQUE all nuts, bolts and screws (Ref. AMM TASK 20-21-11-911-001).
(2) Install the Air Chiller
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector (8) to the connector (9).
(e) Put the access panels (2) and (4) in position and install the screws (1) and (3).
(f) Put the divider panels (7) in position and install the washers (6) and the screws (5).
Subtask 25-34-51-865-090-A ** ON A/C NOT FOR ALL (1) Unless specified, TORQUE all nuts, bolts and screws (Ref. AMM TASK 20-21-11-911-001).
(2) Install the Air Chiller
WARNING:
SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
(a) Carefully put the air chiller (10) in position and install the washers (11) and the screws (12). (b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector (8) to the connector (9).
(e) Put the access panels (2) and (4) in position and install the screws (1) and (3).
(f) Put the divider panels (7) in position and install the washers (6) and the screws (5).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-34-51-942-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
D. Safety Precautions
(1) Remove the warning notice(s) from:
Subtask 25-34-51-710-051-A ** ON A/C NOT FOR ALL (1) Remove the warning notice(s) from:
- The HP and LP ground-air connectors
- The AIR COND section of panel 30VU.
E. Operational Test
(1) Do the operational test of the air chiller unit:
(a) On the galley control panel, make sure that all the applicable circuit breakers of the aft galley are closed.
5. Close-up(1) Do the operational test of the air chiller unit:
(a) On the galley control panel, make sure that all the applicable circuit breakers of the aft galley are closed.
| ACTION | RESULT |
|---|---|
1.On the overhead panel, on the ELEC section of panel 35VU:
| On the GALLEY or GALY & CAB pushbutton switch (2XA):
|
| | On the galley control panel:
|
2.On the galley control panel:
| On the galley control panel:
|
3.On the overhead panel, on the ELEC section of panel 35VU:
| On the GALLEY or GALY & CAB pushbutton switch (2XA):
|
| | On the galley control panel:
|
Subtask 25-34-51-410-051-L ** ON A/C NOT FOR ALL
A. Close Access
(1) If the galley trolley(s) is (are) removed, install it (them).
(2) If the decorative material(s) is (are) removed, install it (them).
(3) If the contents of the galley are removed, install them.
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-34-51-862-051-A ** ON A/C NOT FOR ALL (1) If the galley trolley(s) is (are) removed, install it (them).
(2) If the decorative material(s) is (are) removed, install it (them).
(3) If the contents of the galley are removed, install them.
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Make sure that the work area is clean and clear of tools and other items.
Air Chiller - AFT Galley