Installation of the Air Chiller Unit - Forward Galley
TASK 25-34-51-400-001-A
Installation of the Air Chiller Unit - Forward Galley
Self Explanatory
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-34-51-860-050-A ** ON A/C NOT FOR ALL
Subtask 25-34-51-210-050-I ** ON A/C NOT FOR ALL
Subtask 25-34-51-410-050-F ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:15:24 UTC
Installation of the Air Chiller Unit - Forward Galley
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
ZONE: 220
1. Reason for the JobSelf Explanatory
NOTE: More than one person is necessary for this procedure.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 220 | FWD CAB UTILITY AREAS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-34-51-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the trolleys are removed from the galley.
(3) On the AIR COND panel 30VU:
(a) Make sure that the APU BLEED, the ENG 1/2 BLEED and the PACK 1/2 pushbutton switches are released.
(4) Make sure that a WARNING NOTICE(S) is in position to tell persons not to connect the ground air supply:
On the High Pressure (HP) ground connector
On the Low Pressure (LP) ground connector.
Subtask 25-34-51-865-077-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the trolleys are removed from the galley.
(3) On the AIR COND panel 30VU:
(a) Make sure that the APU BLEED, the ENG 1/2 BLEED and the PACK 1/2 pushbutton switches are released.
NOTE: For the APU BLEED pushbutton switch, the ON legend is off.
For the ENG 1/2 BLEED pushbutton switch, the OFF legends are on.
For the PACK 1/2 pushbutton switch, the OFF legends are on.
(b) Make sure that a WARNING NOTICE(S) is in position to tell persons not to operate these pushbutton switches. For the ENG 1/2 BLEED pushbutton switch, the OFF legends are on.
For the PACK 1/2 pushbutton switch, the OFF legends are on.
(4) Make sure that a WARNING NOTICE(S) is in position to tell persons not to connect the ground air supply:
On the High Pressure (HP) ground connector
On the Low Pressure (LP) ground connector.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
Subtask 25-34-51-210-050-I ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do a visual inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(a) Make sure that the air grill cover (4) is clean and that the grill is not blocked.
Subtask 25-34-51-420-050-H ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do a visual inspection of the component interface and/or the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(a) Make sure that the air grill cover (4) is clean and that the grill is not blocked.
B. Installation of the Air Chiller Unit - Galley 1
(1) Unless specified, TORQUE all nuts, bolts and screws (Ref. AMM TASK 20-21-11-911-001).
(a) Carefully put the air chiller (7) in position on the rails (5) and install the screws (6).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector (4) to the connector (3).
(e) Push the air chiller (7) into its compartment.
(f) Put the air grill (2) in position and install the screws (1).
Subtask 25-34-51-865-078-A ** ON A/C NOT FOR ALL (1) Unless specified, TORQUE all nuts, bolts and screws (Ref. AMM TASK 20-21-11-911-001).
WARNING:
SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
(2) Install the Air Chiller (a) Carefully put the air chiller (7) in position on the rails (5) and install the screws (6).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector (4) to the connector (3).
(e) Push the air chiller (7) into its compartment.
(f) Put the air grill (2) in position and install the screws (1).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-34-51-942-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
D. Safety Precautions
(1) Remove the warning notice(s) from:
Subtask 25-34-51-710-050-A ** ON A/C NOT FOR ALL (1) Remove the warning notice(s) from:
- The HP and LP ground-air connectors
- The AIR COND section of panel 30VU.
E. Operational Test
(1) Do the operational test of the air chiller unit:
(a) On the galley control panel, make sure that all the applicable circuit breakers of the forward galley are closed.
5. Close-up(1) Do the operational test of the air chiller unit:
(a) On the galley control panel, make sure that all the applicable circuit breakers of the forward galley are closed.
| ACTION | RESULT |
|---|---|
1.On the overhead panel, on ELEC panel 35VU:
| On the GALLEY or GALY & CAB pushbutton switch (2XA):
|
| | On the galley control panel:
|
2.On the galley control panel:
| On the galley control panel:
|
3.On the overhead panel, on ELEC panel 35VU:
| On the GALLEY or GALY & CAB pushbutton switch (2XA):
|
| | On the galley control panel:
|
Subtask 25-34-51-410-050-F ** ON A/C NOT FOR ALL
A. Close Access
(1) If the galley trolley(s) is (are) removed, install it (them).
(2) If the decorative material(s) is (are) removed, install it (them).
(3) If the contents of the galley are removed, install them.
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-34-51-862-050-A ** ON A/C NOT FOR ALL (1) If the galley trolley(s) is (are) removed, install it (them).
(2) If the decorative material(s) is (are) removed, install it (them).
(3) If the contents of the galley are removed, install them.
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Make sure that the work area is clean and clear of tools and other items.
Air Chiller - Galley 1