Operational Test of the Electrical Service Supply System
TASK 25-29-00-710-001-A
Operational Test of the Electrical Service Supply System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 25-29-00-861-050-A Subtask 25-29-00-865-050-A
Subtask 25-29-00-710-050-A
Subtask 25-29-00-862-050-A
[Rev.10 from 2021]
2026.03.31 23:33:24 UTC
Operational Test of the Electrical Service Supply System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | MULTIMETER - STANDARD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-29-00-861-050-A Subtask 25-29-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | VACUUM CLEANER SKT-CAB-Z222 | 1ME | F07 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | VACU CLEANER SKT-CAB-Z222 | 1ME | F07 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | VACU CLEANER SKT-CAB-Z222 | 1ME | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU CLEANER SKT-CAB-Z261 | 5ME | F06 |
Subtask 25-29-00-710-050-A
A. Operational Test of the Electrical Service Supply-System
(1) Do the test of the electrical service supply-system.
5. Close-up(1) Do the test of the electrical service supply-system.
NOTE: The test is the same for all wall sockets.
| ACTION | RESULT |
|---|---|
| At the related wall socket: | On the multimeter: |
|
|
| At the related wall socket: | |
| |
Subtask 25-29-00-862-050-A