Installation of the Curtains
TASK 25-26-41-400-013-A
Installation of the Curtains
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 25-26-41-860-053-A
Subtask 25-26-41-210-067-A
Subtask 25-26-41-410-062-A
[Rev.10 from 2021]
2026.04.01 03:48:12 UTC
Installation of the Curtains
FIN: 6375MM ** ON A/C NOT FOR ALL
FIN: 6401MM1 ** ON A/C NOT FOR ALL
FIN: 6402MM1 ** ON A/C NOT FOR ALL
FIN: 6402MM2 ** ON A/C NOT FOR ALL
FIN: 6405MM1 ** ON A/C NOT FOR ALL
FIN: 6405MM2 ** ON A/C NOT FOR ALL
FIN: 6406MM3 ** ON A/C NOT FOR ALL
FIN: 6407MM1 ** ON A/C NOT FOR ALL
FIN: 6407MM3 ** ON A/C NOT FOR ALL
FIN: 6408MM1 ** ON A/C NOT FOR ALL
FIN: 6408MM3 ** ON A/C NOT FOR ALL
FIN: 6409MM1 ** ON A/C NOT FOR ALL
FIN: 6409MM2 ** ON A/C NOT FOR ALL
FIN: 6409MM3 ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 6401MM1 ** ON A/C NOT FOR ALL
FIN: 6402MM1 ** ON A/C NOT FOR ALL
FIN: 6402MM2 ** ON A/C NOT FOR ALL
FIN: 6405MM1 ** ON A/C NOT FOR ALL
FIN: 6405MM2 ** ON A/C NOT FOR ALL
FIN: 6406MM3 ** ON A/C NOT FOR ALL
FIN: 6407MM1 ** ON A/C NOT FOR ALL
FIN: 6407MM3 ** ON A/C NOT FOR ALL
FIN: 6408MM1 ** ON A/C NOT FOR ALL
FIN: 6408MM3 ** ON A/C NOT FOR ALL
FIN: 6409MM1 ** ON A/C NOT FOR ALL
FIN: 6409MM2 ** ON A/C NOT FOR ALL
FIN: 6409MM3 ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-26-41-860-053-A
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
4. Procedure(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 25-26-41-210-067-A
A. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-26-41-420-076-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the curtains into the curtain rails
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Engage the gliders (7) with the curtains (2) into the curtain rails (1).
(3) Install and lock the end stops (5).
(4) If removed, install the cover clips (6) and the cover plates (4) with the screws (3).
5. Close-up(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Engage the gliders (7) with the curtains (2) into the curtain rails (1).
(3) Install and lock the end stops (5).
(4) If removed, install the cover clips (6) and the cover plates (4) with the screws (3).
Subtask 25-26-41-410-062-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-26-41-862-054-A (1) Make sure that the work area is clean and clear of tools and other items.
Curtains