Replacement of the Wall-Mounted Head Padding
TASK 25-22-43-960-001-A
Replacement of the Wall-Mounted Head Padding
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 25-22-43-861-054-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 25-22-43-960-050-A ** ON A/C NOT FOR ALL
Subtask 25-22-43-862-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:30:58 UTC
Replacement of the Wall-Mounted Head Padding
FIN: 6120MM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 25-22-43-861-054-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 25-22-43-960-050-A ** ON A/C NOT FOR ALL
A. Removal/Installation of the Head Padding
(1) Remove the head padding:
(a) Push-up and release the head padding (1) from the studs (2).
(b) If necessary, remove the studs (2) from the lavatory wall.
(2) Install the head padding:
(a) Install the studs (2), if necessary.
(b) Put the head padding (1) in position and push it down to lock it on the studs (2).
5. Close-up(1) Remove the head padding:
(a) Push-up and release the head padding (1) from the studs (2).
(b) If necessary, remove the studs (2) from the lavatory wall.
(2) Install the head padding:
(a) Install the studs (2), if necessary.
(b) Put the head padding (1) in position and push it down to lock it on the studs (2).
Subtask 25-22-43-862-053-A ** ON A/C NOT FOR ALL
Head Padding