W DOC AIRBUS | AMM A320F

Installation of the Seat Belts


TASK 25-21-42-400-002-A
Installation of the Seat Belts


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 25-21-42-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (3) Do an inspection of the component interfaces and the adjacent area.
4. Procedure
Subtask 25-21-42-420-051-A
A. Installation of the Seat Belts
   (1) Install the seat belts of the tourist class seat:
     (a) When you connect/install the components, refer to the match marks made during the removal procedure.
     (b) Put the seat belt (2) in position and engage the snap hook (3) to the anchor stud.
     (c) Make sure that the snap hook (3) is in the locked position.
     (d) Install the seat cushion (1).
   (2) Install the seat belts of the business class seat, if necessary:
     (a) When you connect/install the components, refer to the match marks made during the removal procedure.
     (b) Put the seat belt (2) in position and engage the snap hook (3) to the anchor stud.
     (c) Make sure that the snap hook (3) is in the locked position.
     (d) Install the seat cushion (1).
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-21-42-710-051-A
B. Test of the Seat Belt
   (1) Make sure that the buckle locks/unlocks correctly.
   (2) Make sure that you can adjust the length of the belt correctly.
   (3) Make sure that you can turn seat belt freely around the anchor stud.
5. Close-up
Subtask 25-21-42-862-051-A
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:30:35 UTC