Removal of the Textile Floor Covering of the Cockpit (Carpet)
TASK 25-13-44-000-001-A
Removal of the Textile Floor Covering of the Cockpit (Carpet)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-13-44-861-050-A 4. Procedure
Subtask 25-13-44-020-050-A
[Rev.10 from 2021]
2026.03.31 23:29:15 UTC
Removal of the Textile Floor Covering of the Cockpit (Carpet)
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | SCRAPER - NON METALLIC |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 25-11-41-000-001-A | Removal of the Third Occupant Seat |
| TASK 25-11-51-000-001-A | Removal of the CAPT/F/O Seat |
Subtask 25-13-44-861-050-A 4. Procedure
Subtask 25-13-44-020-050-A
A. Removal of the Seats
(1) Remove the Third Occupant seat (Ref. AMM TASK 25-11-41-000-001).
(2) If necessary, remove the Captain and the First Officer seats (Ref. AMM TASK 25-11-51-000-001).
Subtask 25-13-44-020-052-A (1) Remove the Third Occupant seat (Ref. AMM TASK 25-11-41-000-001).
(2) If necessary, remove the Captain and the First Officer seats (Ref. AMM TASK 25-11-51-000-001).
B. Removal of the Case Stops
(1) Remove the eight screws (1) and washers (2).
(2) Remove the four case stops (3).
Subtask 25-13-44-020-053-A (1) Remove the eight screws (1) and washers (2).
(2) Remove the four case stops (3).
C. Removal of the Straps
(1) Remove the 12 screws (1) and washers (2).
(2) Remove the four stirrups (3).
(3) Remove the angle fitting (4).
(4) Remove the two straps (5).
Subtask 25-13-44-020-051-A ** ON A/C NOT FOR ALL (1) Remove the 12 screws (1) and washers (2).
(2) Remove the four stirrups (3).
(3) Remove the angle fitting (4).
(4) Remove the two straps (5).
D. Removal of the Textile Floor Covering
(1) Remove the 12 screws (5).
(2) Remove the grid (3).
(3) Remove the cover strip (4).
(4) Remove the floor covering (1):
(a) Use the SCRAPER - NON METALLIC to release the carpet from the floor.
(b) Remove the remaining double-sided adhesive tape (2) with the SCRAPER - NON METALLIC.
Subtask 25-13-44-020-051-B ** ON A/C NOT FOR ALL (1) Remove the 12 screws (5).
(2) Remove the grid (3).
(3) Remove the cover strip (4).
(4) Remove the floor covering (1):
(a) Use the SCRAPER - NON METALLIC to release the carpet from the floor.
(b) Remove the remaining double-sided adhesive tape (2) with the SCRAPER - NON METALLIC.
D. Removal of the Textile Floor Covering
(1) Remove the screws (2).
(2) Remove the cover strip (3).
(3) Remove the textile floor covering (1):
(a) Use a SCRAPER - NON METALLIC to release the textile floor covering (1) from the floor.
(b) With the non metallic scrapper, remove the remaining double sided adhesive tape (4).
(1) Remove the screws (2).
(2) Remove the cover strip (3).
(3) Remove the textile floor covering (1):
(a) Use a SCRAPER - NON METALLIC to release the textile floor covering (1) from the floor.
(b) With the non metallic scrapper, remove the remaining double sided adhesive tape (4).