General Visual Inspection of EWIS Installed in the Pylon Primary Structure (EWIS)
TASK 24-92-00-210-816-A
General Visual Inspection of EWIS Installed in the Pylon Primary Structure (EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200415-01
GENERAL VISUAL INSPECTION OF EWIS INSTALLED IN THE PYLON PRIMARY STRUCTURE (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-92-00-941-070-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-210-118-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-410-168-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:26:44 UTC
General Visual Inspection of EWIS Installed in the Pylon Primary Structure (EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200415-01
GENERAL VISUAL INSPECTION OF EWIS INSTALLED IN THE PYLON PRIMARY STRUCTURE (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. For the EWIS refer to ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | FLASHLIGHT |
| No specific | AR | MIRROR - INSPECTION, FLEXIBLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 415 | LOWER PYLON |
| 425 | LOWER PYLON |
| 415AL, 415AR, 415BL, 415BR, 415CR, 425AL, 425AR, 425BL, 425BR, 425CR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 54-51-21-000-802-A | Removal of the Pylon Lateral Access-Doors |
| TASK 54-51-21-400-802-A | Installation of the Pylon Lateral Access-Doors |
| ESPM 2052110 | |
Subtask 24-92-00-941-070-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(2) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(a) Put WARNING NOTICE(S) in position to tell persons not to operate the ENG/MODE selector switch and the ENG/MASTER 1(2) control switch.
(3) On the ENG section of maintenance panel 50VU:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 24-92-00-010-170-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(2) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(a) Put WARNING NOTICE(S) in position to tell persons not to operate the ENG/MODE selector switch and the ENG/MASTER 1(2) control switch.
(3) On the ENG section of maintenance panel 50VU:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position:
(a) For the left pylon, in zone 410.
(b) For the right pylon, in zone 420.
(2) Remove the pylon lateral access-doors (Ref. AMM TASK 54-51-21-000-802):
(a) For the left pylon 415AL 415AR 415BL 415BR 415CR.
(b) For the right pylon 425AL 425AR 425BL 425BR 425CR.
4. Procedure(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position:
(a) For the left pylon, in zone 410.
(b) For the right pylon, in zone 420.
(2) Remove the pylon lateral access-doors (Ref. AMM TASK 54-51-21-000-802):
(a) For the left pylon 415AL 415AR 415BL 415BR 415CR.
(b) For the right pylon 425AL 425AR 425BL 425BR 425CR.
Subtask 24-92-00-210-118-A ** ON A/C NOT FOR ALL
A. General Visual Inspection of all Wiring Installed in the Pylon Primary Structure
(1) Do a visual inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110:
(a) On the engine-control routes 1S and 2S.
(b) On the routes 1M and 2M.
5. Close-up(1) Do a visual inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110:
(a) On the engine-control routes 1S and 2S.
(b) On the routes 1M and 2M.
NOTE: Use a FLASHLIGHT or a MIRROR - INSPECTION, FLEXIBLE if necessary.
(2) Make sure that there is no dust, fuel leak or hydraulic contamination. Subtask 24-92-00-410-168-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the pylon lateral access-doors (Ref. AMM TASK 54-51-21-400-802):
(a) For the left pylon 415AL 415AR 415BL 415BR 415CR.
(b) For the right pylon 425AL 425AR 425BL 425BR 425CR.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the pylon lateral access-doors (Ref. AMM TASK 54-51-21-400-802):
(a) For the left pylon 415AL 415AR 415BL 415BR 415CR.
(b) For the right pylon 425AL 425AR 425BL 425BR 425CR.
(3) Remove the access platform(s).
Access Panels of the Left Pylon