Installation of the Transformer Rectifier


TASK 24-32-51-400-001-A
Installation of the Transformer Rectifier


WARNING: MAKE SURE THAT NO AC OR DC POWER IS CONNECTED TO THE AIRCRAFT ELECTRICAL CIRCUITS. THERE IS A RISK OF ELECTROCUTION IF THE AC OR DC POWER STAYS CONNECTED.
ZONE: 126
FIN: 1PU1
FIN: 1PU2
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
Torque wrench: range to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in ) T
No specific
Torque wrench: range to between 1.6 and 1.5 m.daN (11.80 and 11.06 lbf.ft ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
126
LATERAL AVIONIC COMPARTMENT
822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-32-00-710-001-A
Operational Test of the DC Generation Switching
3. Job Set-up
Subtask 24-32-51-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 1PU1 (TR1)
123VUTR1/SPLY2PU1AB10
FOR FIN: 1PU2 (TR2)
123VUTR2/SVCE/BUS 2/SPLY1XXAB08
123VUTR2/214XP/SPLY2PU2AB04
Subtask 24-32-51-010-051-A
B. Get access to the avionics compartment.
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in positon at the access door 822.
   (2) Make sure that the access door 822 is open.
4. Procedure
Subtask 24-32-51-420-050-A
A. Installation of the Transformer Rectifier
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Engage the transformer rectifier (1) on the centering pins to put it in position.
   (4) Install the washers (10) and the screws (11) and then tighten the screws.
   (5) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (6) Make sure that all the electrical connections are clean and in the correct condition.
   (7) Connect the connectors (6) to the transformer rectifier.
   (8) Remove the insulating sleeves from the lugs (3).
   (9) Connect the lugs (3) to the output terminals (2) of the transformer rectifier.
   (10) Install the washer (4) and the nut (5) and TORQUE it to between 1.6 and 1.5 m.daN (11.80 and 11.06 lbf.ft ) T.
   (11) Install the washer (9) and the nut (8) and TORQUE it to between 0.7 and 0.6 m.daN (61.95 and 53.10 lbf.in )
T.
   (12) Install the protective caps (7) on the output terminals (2).
Subtask 24-32-51-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 1PU1 (TR1)
123VUTR1/SPLY2PU1AB10
FOR FIN: 1PU2 (TR2)
123VUTR2/SVCE/BUS 2/SPLY1XXAB08
123VUTR2/214XP/SPLY2PU2AB04
Subtask 24-32-51-710-050-A
C. Do an operational test of DC Generation Switching (Ref. AMM TASK 24-32-00-710-001)
NOTE: Before you start the operational test, you must reset the transformer rectifier from the CFDS.
5. Close-up
Subtask 24-32-51-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 822.
   (3) Remove the access platform(s).