Operational Test of the DC Generation Switching
TASK 24-32-00-710-001-A
Operational Test of the DC Generation Switching
Refer to the MPD TASK: 243200-01
OPERATIONAL CHECK OF DC GENERATION SWITCHING
Make sure that DC BUS1, DC BUS2 and DC ESS busbars are supplied if transformer TR1 or TR2 fails.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-32-00-860-050-A
Subtask 24-32-00-710-050-A
Subtask 24-32-00-865-055-A
[Rev.10 from 2021]
2026.03.31 23:23:19 UTC
Operational Test of the DC Generation Switching
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 243200-01
OPERATIONAL CHECK OF DC GENERATION SWITCHING
Make sure that DC BUS1, DC BUS2 and DC ESS busbars are supplied if transformer TR1 or TR2 fails.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 812, 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-004-A | Procedure to Get Access to the SYSTEM REPORT/TEST/ELEC Page |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 24-32-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) In the cockpit, on the overhead panel 35VU, make sure that the BAT1 and BAT2 pushbutton switches are pushed. (On these pushbutton switches, the OFF legend is off).
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(4) On the ECAM control panel, get the ELEC page.
(5) On the MCDU, get the ELEC menu on the SYSTEM REPORT/TEST page. (Ref. AMM TASK 31-32-00-860-004)
Subtask 24-32-00-010-050-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) In the cockpit, on the overhead panel 35VU, make sure that the BAT1 and BAT2 pushbutton switches are pushed. (On these pushbutton switches, the OFF legend is off).
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(4) On the ECAM control panel, get the ELEC page.
(5) On the MCDU, get the ELEC menu on the SYSTEM REPORT/TEST page. (Ref. AMM TASK 31-32-00-860-004)
NOTE: If during the electrical transfers, the displays on the lower ECAM display unit or on the MCDU go out of view, do paragraph (4) or (5) again.
B. Get access to the avionics compartment.
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812 and 822.
(2) Open the access doors 812 and 822.
Subtask 24-32-00-865-054-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE at the access doors 812 and 822.
(2) Open the access doors 812 and 822.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 24-32-00-865-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
D. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CARGO FIRE/EXTIG/BTL1 | 1WX | C03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CARGO/FIRE/EXTIG/BTL1 | 1WX | C04 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CARGO/FIRE/EXTIG/BTL1 | 1WX | C03 |
| ** ON A/C ALL | |||
| 105VU | ELEC/HOT BUS/702PP SPLY | 12PB2 | E02 |
| 105VU | ELEC/HOT BUS/701PP SPLY | 12PB1 | E01 |
| 106VU | AC ESS/BUS NORM/CNTOR/CTL | 4XC | B03 |
| 106VU | ESS TR/CNTOR/CTL | 5PE | C02 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| 121VU | APU/FIRE/EXTIG/SQUIB/A | 1WF | L38 |
| 121VU | APU/FIRE/LP VALVE/NORM | 4WF | M42 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/CARGO/FIRE/EXTIG | 1WX | T19 |
| ** ON A/C ALL | |||
| 122VU | ELEC/CNTOR/DC BUS/TIE 1/FAULT | 14PC | U24 |
| 122VU | ELEC/AC/BUS1/CTL | 17XN1 | V25 |
| 122VU | LIGHTING/WING/STROBE | 10LV | V05 |
| 122VU | ELEC/TR2/FAULT/DC BUS TIE/CONFIG | 7PC2 | W30 |
| 122VU | ELEC/TR1/FAULT/DC BUS TIE/CONFIG | 7PC1 | W29 |
| 122VU | ELEC/CNTOR/ESS/DC BUS/TIE | 3PC | W26 |
| 122VU | ELEC/CNTOR/DC/BUS/TIE1 | 9PC | W25 |
| 122VU | ELEC/TR2/MONG | 3PU2 | X26 |
| 122VU | ELEC/TR1/MONG | 3PU1 | X25 |
| 123VU | TR1/SPLY | 2PU1 | AB10 |
| 123VU | TR2/214XP/SPLY | 2PU2 | AB04 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| 124VU | TR2/CNTOR/SPLY | 4PU2 | BC01 |
| 125VU | TR1/CNTOR/SPLY | 4PU1 | CF01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEMI AUTO CLS-FWD | 3MY | E08 |
| 2000VU | SEMI AUTO CLS-FWD | 2MY | E06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | SEMI AUTO CLS-AFT | 103MY | D08 |
| 2001VU | SEMI AUTO CLS-AFT | 102MY | D06 |
Subtask 24-32-00-710-050-A
A. Operational Test of the DC Generation Switching
5. Close-upNOTE: This test is for the system 1. For the other system(s), use the indications between the parentheses.
| ACTION | RESULT |
|---|---|
1.On the overhead panel, on ELEC panel 35VU:
| On the overhead panel, on ELEC panel 35VU:
|
2.On the overhead panel, on ELEC panel 35VU:
| On the overhead panel, on ELEC panel 35VU:
|
3.On the rear circuit breaker panel, on panel 122VU:
| On the lower ECAM display unit:
|
4.On the rear circuit breaker panel, on panel 125VU (124VU):
| On the upper ECAM display unit:
|
| | On the lower ECAM display unit:
|
5.On the rear circuit breaker panel, on panels 122VU and 125VU (124VU):
| There is no change. |
6.On the MCDU, on the ELEC page:
| On the MCDU:
|
7.On the MCDU:
| On the TR1(2) page:
|
| | On the upper ECAM display unit:
|
| | On the lower ECAM display unit:
|
8.On the MCDU:
| |
9.On the overhead panel, on ELEC panel 35VU:
| On the overhead panel, on ELEC panel 35VU:
|
10.On the overhead panel, on ELEC panel 35VU:
| On the overhead panel, on ELEC panel 35VU:
|
11.On the ECAM control panel:
| On the lower ECAM display unit:
NOTE: It is possible that the ESS TR continues to supply the DC ESS busbar. If this occurs, on the AC power center 123VU, open and close circuit breaker 1XC. Make sure that the ESS TR no longer supplies the DC ESS busbar. |
| 12.Wait until the BAT1 and the BAT2 are not connected to the DC BAT busbar. | On the lower ECAM display unit:
|
13.On the rear circuit breaker panel, on panel 123VU:
| On the upper ECAM display unit:
|
| | On the lower ECAM display unit:
|
14.On the rear circuit breaker panel, on panel 123VU:
| On the lower ECAM display unit:
|
15.On the MCDU, on the ELEC page:
| On the MCDU:
|
16.On the MCDU:
| On the MCDU, on the TR1(2) page:
|
| | On the upper ECAM display unit:
|
| | On the lower ECAM display unit:
|
| 17.On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view. | |
18.On the overhead panel, on ELEC panel 35VU:
| On the overhead panel, on ELEC panel 35VU:
|
19.On the overhead panel, on ELEC panel 35VU:
| On the overhead panel, on ELEC panel 35VU:
|
20.On the ECAM control panel:
| On the lower ECAM display unit:
NOTE: It is possible that the ESS TR continues to supply the DC ESS busbar. If this occurs, on the AC power center 123VU, open and close circuit breaker 1XC. Make sure that the ESS TR no longer supplies the DC ESS busbar. |
Subtask 24-32-00-865-055-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-32-00-860-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
B. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Subtask 24-32-00-410-050-A (1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).