GENERAL VISUAL INSPECTION OF VENT SURGE TANK (EWIS)
TASK 05-25-50-200-001-A
GENERAL VISUAL INSPECTION OF VENT SURGE TANK (EWIS)
Refer to the MPD TASK: ZL-550-01
GENERAL VISUAL INSPECTION OF VENT SURGE TANK (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-25-50-010-050-A
Subtask 05-25-50-210-050-A
Subtask 05-25-50-410-050-A
[Rev.10 from 2021]
2026.03.31 22:50:27 UTC
GENERAL VISUAL INSPECTION OF VENT SURGE TANK (EWIS)
ZONE: 550
1. Reason for the JobRefer to the MPD TASK: ZL-550-01
GENERAL VISUAL INSPECTION OF VENT SURGE TANK (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 550 | VENT SURGE TANK |
| 550AB, 550BB, 550CB, 550DB, 650AB, 650BB, 650CB, 650DB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 57-27-11-000-002-A | Removal of the Access Panel |
| TASK 57-27-11-400-002-A | Installation of the Access Panel |
Subtask 05-25-50-010-050-A
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position.
(2) Remove the access panels:
550BB 550DB,
650BB 650DB,
550AB 550CB,
650AB 650CB, (Ref. AMM TASK 57-27-11-000-002).
4. Procedure(1) Put an ACCESS PLATFORM 3M (10 FT) in position.
(2) Remove the access panels:
550BB 550DB,
650BB 650DB,
550AB 550CB,
650AB 650CB, (Ref. AMM TASK 57-27-11-000-002).
Subtask 05-25-50-210-050-A
A. Inspection
(1) Do a general visual inspection of the vent surge tank.
(2) Make sure that there are no signs of corrosion (this includes bonding leads), cracks or damage.
(3) Make sure that all the installations (ducting, piping, bonding leads) are attached correctly.
5. Close-up(1) Do a general visual inspection of the vent surge tank.
(2) Make sure that there are no signs of corrosion (this includes bonding leads), cracks or damage.
(3) Make sure that all the installations (ducting, piping, bonding leads) are attached correctly.
Subtask 05-25-50-410-050-A
Access Panels of the Vent Surge Tank of the Wing